Laserfiche WebLink
Manhour Fee Justification <br />Client:City of South Bend <br />Project Name:Ironwood Dr, & Ireland Rd. Intersection Improvements <br />Project No.:22-1089 <br />Manhour Justification Principle / Sr Proj MgrSr. Proj Engr / PM/ Sr. ConsultantSr Engr / Sr Dsgr / Sr Surv.Engr / Dsgr / SurvSr Tech /Sr ObservTechnician / ObserverAdmin2 Man Survey Crew1 Man Survey Crew Task Description Totals Total Fee <br />Task 3 Final Design (100%)0 56 180 172 0 0 0 0 0 408 50,120$ <br />3.0 Final Title Sheet/obtain signatures of PWD 2 4 710$ <br />3.1 Finalize Index Sheet with Pertinent Utility Information 4 8 1,420$ <br />3.2 Typical Cross Sections 12 24 4,260$ <br />3.3 Finalize MOT/Pedestrian plans with Signage and note 40 48 10,520$ <br />3.4 Final Plan and Profile on Aerial Mapping showing exist./prop. elev's <br />for ramps and pavement, show flow arrows to nearby inlets 40 16 6,840$ <br />3.5 Final details of curb ramps and Islands 8 16 2,840$ <br />3.6 Final Erosion Control Plans 8 16 2,840$ <br />3.7 Final Pavement Marking and Signage Plan 8 1,000$ <br />3.8 Final Miscellaneous details, driveway replacement table, structure <br />replacement table/ incidental work.2 6 8 1,950$ <br />3.9 Final Quantity Calcs and Cost Estimates 2 8 4 1,740$ <br />3.10 Permit Application- Rule 5 8 12 2,380$ <br />3.11 Finalize Specifications 8 16 3,120$ <br />3.12 Site Visit 8 1,120$ <br />3.13 Project Management 8 1,120$ <br />3.14 QA/QC time 16 2,240$ <br />3.15 Mtg with City review / 1 visit PM/Designer visit 8 8 2,120$ <br />3.16 Compliance with City at 100% Review 4 12 16 3,900$ <br />Task 4 Traffic Signal Design 8 24 44 84 0 0 0 0 0 160 20,000$ <br />4.0 Traffic Signal Design & Plans 8 24 44 84 20,000$ <br />Task 5 Utility (8 Utility Companies)0 17 54 2 0 0 0 0 0 73 9,360$ <br />5.0 Notify all Utilities of the project (Initial Notice)2 2 480$ <br />5.1 Notify all Utilities to verify their facilities (Utility Verification)4 500$ <br />5.2 Submit Preliminary Final Plans/Request Work Plan 1 8 1,140$ <br />5.3 Review Utility Work Plan/Relocation Plans 16 40 7,240$ <br />Task 6 Permits - IDEM Construction Stormwater General Permit 0 2 0 40 0 0 1.5 0 0 43.5 5,000$ <br />6.0 Plan Preparation & SWPPP 2 16 2,120$ <br />Revised 22-1089 South Bend 2022 Road Rehab - Ironwood Dr. & Ireland Rd. Intersection Fee NT.xlsx 2 of 4