My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design and Grant Application Assistance for Kennedy Park Improvements – DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design and Grant Application Assistance for Kennedy Park Improvements – DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 3:19:16 PM
Creation date
12/13/2022 3:18:55 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 11 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />5. Plan or Sketch of the Site Features identifying location of planned recreational <br />improvements and other features such as where the public will access the site, parking, etc. <br />A1.12 Public Outreach <br />A. Aquatics Focus Group – In conjunction with Owner, facilitate up to two (2) focus group <br />discussions with targeted stakeholders regarding the system-wide aquatics improvements. <br />B. Community Open House – In conjunction with Owner, provide materials documenting the <br />preferred alternative and help facilitate one (1) community open house event to provide an update <br />on the project prior to final grant application. <br />A1.13 Schedule <br />A. Engineer shall perform the services above according to the following schedule: <br />Anticipated Notice to Proceed date is November 22, 2022 <br />Topographic Survey 30 days after Notice to Proceed <br />Geotechnical Services 45 days after Notice to Proceed <br />Limited Drainage Study 30 days after Notice to Proceed <br />Draft Conceptual Planning Phase <br />Document Submittal 14 days after Notice to Proceed <br />Owner Concept Review #1 3 days after Concept Design <br />Refine Conceptual Planning Document 7 days after Owner Review Mtg. #1 <br />Owner Concept Review #2 3 days after Refined Concept Design <br />Conceptual Planning Document 5 days after Owner Review Mtg. #2 <br />Draft Preliminary Design 14 days after Concept Design <br />Owner Review of Draft Preliminary Design 3 days after Preliminary Design <br />Preliminary Design Submittal 10 days after Owner Review <br />1. Services under tasks A1.08 through A1.12 will all be performed within the timeline <br />established above and prior to the Final Preliminary Design Submittal. <br />2. To achieve the schedule noted above, the Conceptual Planning and Preliminary Design <br />phases will occur concurrently. <br />A1.14 Bidding or Negotiating Phase <br />A. After acceptance by Owner of the bidding documents and the most recent opinion of probable <br />Construction Cost as determined in the Final Design Phase, and upon written authorization by <br />Owner to proceed, Engineer shall: <br />1. Assist Owner in advertising for and obtaining bids or proposals for the Work and, where <br />applicable, maintain a record of prospective bidders to whom Bidding Documents have <br />been issued, attend pre-bid conferences, if any, and receive and process contractor deposits <br />or charges for the bidding documents. <br />2. Issue addenda as appropriate to clarify, correct, or change the bidding documents. <br />December 13, 2022----------------------------
The URL can be used to link to this page
Your browser does not support the video tag.