My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Recommendation for Acceptance - Additional Five Flashing Beacons – Michiana Contracting, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
Recommendation for Acceptance - Additional Five Flashing Beacons – Michiana Contracting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 3:10:22 PM
Creation date
11/22/2022 3:10:12 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10/28/2022 <br />Contract T -41189 <br />Date Construction Substantially Completed: 10/05/2022 <br />(The contract is sufficiently completed so that it can be used for its intended purpose.) <br />All Contract Work Complete Date <br />Pre-Final Inspection made by <br />on <br />Date Punch List Items Completed: <br />Sod Maintenance Expired on : <br />Final Inspection made by: <br />on <br />and all work was found to be satisfactory from Stationand all work was found to be satisfactory from Station to <br />Date Construction Signs and Temporary Traffic Control Devices Removed: 10/28/2022 <br />Pavement Markings (have) (have not) been placed in accordance with the IMUTCD manual or as <br />directed by the District Traffic Engineer. N/A <br />Right-of-Way (is) (is not) clear of all encroachments. N/A <br />Date of Last Work: 10/05/2022 <br />10/12/2022 <br />11/01/2022 <br />Date Failed Material Replaced: <br />Pre-Final Inspection made by <br />on 10/12/2022 <br />Date Punch List Items Completed:10/28/2022 <br />Sod Maintenance Expired on :N/A <br />11/01/2022Date Failed Material Replaced: <br />Final Inspection made by: <br />on 11/01/2022 <br />(The date all items were complete, except punchlist and removal of traffic control devices.) <br />10/28/2022 <br />Report of Contract Final Inspection and <br />Indiana Department Of Transportation <br />SMIC 639 <br />Recommendation for Acceptance <br />RECOMMEND ACCEPTANCE <br />DISTRICT CONSTRUCTION ENGINEER <br />LOCAL PUBLIC AGENCY <br />*County or City signatures <br />when required (at least two). <br />* By: <br />* By: <br />* By: <br />Scott Kreeger, Steve Hauersperger, Mike Fisher, Toy Villa <br />and Steve Menis <br />Scott Kreeger and Mike Fisher <br />November 22, 2022
The URL can be used to link to this page
Your browser does not support the video tag.