My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Angela Blvd. Pedestrian Safety Improvements - DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Angela Blvd. Pedestrian Safety Improvements - DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:49:26 PM
Creation date
10/25/2022 1:49:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/25/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 9 <br />(Exhibit A –Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />11. Shop Drawings and Samples: Review and approve or take other appropriate action in respect <br />to Shop Drawings and Samples and other data which Contractor is required to submit, but <br />only for conformance with the information given in the Contract Documents and <br />compatibility with the design concept of the completed Project as a functioning whole as <br />indicated by the Contract Documents. Such reviews and approvals or other action will not <br />extend to means, methods, techniques, sequences, or procedures of construction or to safety <br />precautions and programs incident thereto. Engineer shall meet any Contractor’s submittal <br />schedule that Engineer has accepted. <br />12. Substitutes and “or-equal”: Evaluate and determine the acceptability of substitute or “or- <br />equal” materials and equipment proposed by Contractor, but subject to the provisions of <br />Paragraph A2.02.A.2 of this Exhibit A. <br />13. Inspections and Tests: DELETED <br />14. Disagreements between Owner and Contractor: DELETED <br />15. Applications for Payment: DELETED <br />16. Contractor’s Completion Documents: DELETED <br />17. Substantial Completion: DELETED <br />18. Additional Tasks: Perform or provide the following additional Construction Phase tasks or <br />deliverables: <br />a. The Engineer will provide design support to the Owner’s Resident Project Engineer, as <br />required and as directed by the Owner. The Engineer will meet at the project site with <br />the Owner or their Resident Project Engineer, as directed by the Owner, to assist in any <br />matter that may arise during the construction of the project. <br />19. Final Notice of Acceptability of the Work: DELETED <br />A. Duration of Construction Phase: DELETED <br />B. Limitation of Responsibilities: Engineer shall not be responsible for the acts or omissions of any <br />Contractor, Subcontractor or Supplier, or other individuals or entities performing or furnishing any <br />of the Work, for safety or security at the Site, or for safety precautions and programs incident to <br />Contractor's Work, during the Construction Phase or otherwise. Engineer shall not be responsible <br />for the failure of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br />D1.02 Post-Construction Phase: DELETED <br />PART 2 – ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner’s Written Authorization <br /> <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional Services <br />of the types listed in the following paragraphs. These services are not included as part of the basic
The URL can be used to link to this page
Your browser does not support the video tag.