<br />Page 8 <br />(Exhibit A –Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />issued, attend pre-bid conferences, if any, and receive and process contractor deposits or <br />charges for the bidding documents. <br />2. Issue addenda as appropriate to clarify, correct, or change the bidding documents. <br />3. Provide information or assistance needed by Owner in the course of any negotiations with <br />prospective contractors. <br />4. Consult with Owner as to the acceptability of subcontractors, suppliers, and other individuals <br />and entities proposed by prospective contractors for those portions of the Work as to which <br />such acceptability is required by the bidding documents. <br />5. If bidding documents require, the Engineer shall evaluate and determine the acceptability of <br />"or equals" and substitute materials and equipment proposed by bidders, but subject to the <br />provisions of paragraph A2.02.A.2 of this Exhibit A. <br />6. Attend the Bid opening, prepare Bid tabulation sheets, and assist Owner in evaluating Bids <br />or proposals and in assembling and awarding contracts for the Work. <br />7. Perform or provide the following additional Bidding or Negotiating Phase tasks or <br />deliverables: [here list any such tasks or deliverables] <br />B. The Bidding or Negotiating Phase will be considered complete upon commencement of the <br />Construction Phase or upon cessation of negotiations with prospective contractors. <br />A1.06 Construction Phase <br />A. Upon successful completion of the Bidding and Negotiating Phase, and upon written authorization <br />from Owner, Engineer shall: <br />1. General Administration of Construction Contract: DELETED <br />2. Resident Project Representative (RPR): DELETED <br />3. Selecting Independent Testing Laboratory: DELETED <br />4. Pre-Construction Conference: Participate in a Pre-Construction Conference prior to <br />commencement of Work at the Site. <br />5. Schedules: DELETED <br />6. Baselines and Benchmarks: DELETED <br />7. Visits to Site and Observation of Construction: DELETED <br />8. Defective Work: DELETED <br />9. Clarifications and Interpretations; Field Orders: DELETED <br />10. Change Orders and Work Change Directives: DELETED