My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Angela Blvd. Pedestrian Safety Improvements - DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Angela Blvd. Pedestrian Safety Improvements - DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:49:26 PM
Creation date
10/25/2022 1:49:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/25/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 5 <br />(Exhibit A –Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />1) Pedestrian actuated operation consisting of APS push buttons and pedestrian <br />indications. <br />2) Signal strain or mast arm poles based on City of South Bend, INDOT and Indiana <br />Manual on Uniform Traffic Control Devices (IMUTCD) design standards and <br />aesthetically compatible with other existing traffic signal equipment within the <br />project limits. <br /> <br />f. Develop traffic signal design plans for traffic signal modifications for the 3 existing <br />signals at the intersections of Angela Boulevard/Notre Dame Avenue, Angela <br />Boulevard/Eddy Street and Angela Boulevard/Leahy Drive. Traffic signal modifications <br />will include the following: <br />1) Adjust signal heads for revised lane configurations. <br />2) Replace signal detection with Grid Smart video detection system. <br />3) Replace pedestrian signal heads, push buttons and audible pedestrian signals (APS). <br />4) Stripe pedestrian crosswalks with high visibility markings. <br />5) Mast arms and poles are not being replaced. It is assumed existing structures will <br />accommodate adjustments to the signal head placement. <br />6) Existing service points to remain. <br />7) Preparation of signal timing in a format for direct download to the signal controller <br />is not included in the scope. <br /> <br />g. Develop traffic signal design plans for traffic signal modifications for the existing signal <br />at the intersection of Angela Boulevard/SR 933. Traffic signal modification will include <br />the following: <br />1) Replace pedestrian signal heads, push buttons and audible pedestrian signals (APS). <br />2) Stripe pedestrian crosswalks with high visibility markings. <br />3) Mast arms and poles are not being replaced. <br />4) Existing service points to remain. <br /> <br />h. Develop spot elevations, detail curb realignment/bumpouts, curb ramps, and add storm <br />sewer inlets at the following intersection’s locations: <br />1) Angela Boulevard and Eddy Street: All four corners, including 8 curb ramps, and <br />two median islands. <br />2) Angela Boulevard and Duey Street/Joyce Drive: All four corners, including 6 curb <br />ramps, and two median islands. <br />3) Any pavement patching along the new curb line will match the existing pavement <br />section, geotechnical borings or pavement design will not be performed. <br />4) At mid-block HAWK traffic signal crossing if required. <br />5) The Angela Boulevard and SR 933 curb ramps were just replaced by INDOT and <br />anticipated to remain in place. <br />6) The Angela Boulevard and Notre Dame Avenue curb ramps will remain in place <br />since no pavement will be replaced at the intersection. <br /> <br />i. Provide utility coordination and mapping for design purposes. Utility mapping will be <br />based upon information obtatin from utility Owners.
The URL can be used to link to this page
Your browser does not support the video tag.