My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bill No. 22-48 Confirming the Adoption of a Declaratory Resolution Steel Warehouse Tax Abatement
sbend
>
Public
>
Common Council
>
Legislation
>
Upcoming Bills
>
2022
>
10-24-2022
>
Resolutions
>
Bill No. 22-48 Confirming the Adoption of a Declaratory Resolution Steel Warehouse Tax Abatement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 7:34:57 PM
Creation date
10/19/2022 12:06:22 PM
Metadata
Fields
Template:
City Council - City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
July 6, 2022 <br />Memorandum to :Files <br />Subject :Cold Reducing Mill Enhancement Project <br />Steel Warehouse Company LLC has operated a cold reducing mill in its South Bend <br />facility for many years . In order to remain competitive in the markets that the mill serves, Steel <br />Warehouse believes it is necessary to make enhancements to the mill , as well as to some <br />subsidiary equipment, as set forth below: <br />1. Mill Entry Guides -this will include an entry guide box , to assist threading the <br />steel strip into the mill and to pro vi de back tension on the payoff pass . It will also include new <br />mounting arrangements for the X-ray Gauge, along with support structure and miscellaneous <br />hardware ; entry and support structure. <br />2 . Mill Stand Equipment -this will include the addition of two top backup roll <br />wipers to assist in strip cleaning , utilizing new spreader bar pods to support the new wiper <br />assemblies. <br />3 . Mill Exit Equipment -this consists of new Coolant Dam , Exit Guide Box , <br />Edge Bead Removal system , along with other as sociated equipment and exit end support <br />structure. It will include addition of a las er type gauge for enhanced thickness control and a <br />deflector roll wiper. <br />4 . Hydraulic Equipment -this will include a hydraulic valve stand for all new <br />hydraulic functions. <br />5. Pneumatic Equipment -this will include valves for all pneumatically <br />controlled functions . <br />6. Updated Electrical Equipment -this will include additional motors , limit <br />switches , sensors and wiring injunction boxes for all the operation of the mill. <br />7. Spare Part s for all of the above. <br />8 . Foundation for the mill to replace the existing foundation . <br />9 . Enhancements to the exis ting slitting line next to the cold reducing mill. <br />I 0 . Installation of wall partitions, to control the environment for operation of the <br />mill from exposure to the various elements that enter the facility while the main doors are open.
The URL can be used to link to this page
Your browser does not support the video tag.