My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design Services 2023 Small Drainage Improvements Proj No. 123-006 – A&Z Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design Services 2023 Small Drainage Improvements Proj No. 123-006 – A&Z Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2022 4:05:41 PM
Creation date
10/11/2022 4:05:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Client: South Bend <br />Project: Small Drainage Projects - Blackford Court <br />Project No.: 22-1166 <br />Manhour Budget Principle / Sr Proj MgrSr. Proj Engr / PM/ Sr. ConsultantSr Engr / Sr Dsgr / Sr Surv.Engr / Dsgr / SurvSr Tech /Sr ObservTechnician / ObservorTwo Person Survey CrewOne Person Survey CrewLabor Summary <br />Task Description Total Hrs Total Fee <br />Task 1 Blackford Court - Drainage Study / Survey 6 18 48 36 0 0 26 4 138 16,970$ <br />Task 2 0 0 0 0 0 0 0 0 0 0 -$ <br />Task 3 0 0 0 0 0 0 0 0 0 0 -$ <br />Task 4 0 0 0 0 0 0 0 0 0 0 -$ <br />Hour Totals 6 18 48 36 0 0 26 4 138 <br />Labor Rate 170.00 125.00 115.00 105.00 100.00 90.00 150.00 125.00 <br />Labor Cost 1,020$ 2,250$ 5,520$ 3,780$ -$ -$ 3,900$ 500$ 16,970$ 16,970$ <br />Labor Multiplier 1.000 <br />Labor Total 1,020$ 2,250$ 5,520$ 3,780$ -$ -$ 3,900$ 500$ 16,970$ <br />Direct Expenses MileagePer Diem - Lodging/ MealsTask Description mi ea lsum lsum each each each each Total Sub Exp <br />Task 1 Blackford Court - Drainage Study / Survey 320$ 2$ 448$ <br />Task 2 0 -$ <br />Task 3 0 -$ <br />Task 4 0 -$ <br />Totals 320$ 2$ -$ -$ -$ -$ -$ -$ 448$ <br />Expense Rate 0.62 125.00 1.10 1.10 1.10 0.00 0.00 0.00 <br />Subconsultant Expenses 198$ 250$ -$ -$ -$ -$ -$ -$ 448$ <br />Total Direct Expenses 448$ <br />Total Labor Expenses 16,970$ <br />Total Project Fee 17,418$ <br />22-1166 South Bend - Small Drainage Projects - Blackford Ct 09-01-22 2 of 2
The URL can be used to link to this page
Your browser does not support the video tag.