Laserfiche WebLink
Client: South Bend <br />Project: Small Drainage Projects - Garland Circle <br />Project No.: 22-1166 <br />Manhour Budget Principle / Sr Proj MgrSr. Proj Engr / PM/ Sr. ConsultantSr Engr / Sr Dsgr / Sr Surv.Engr / Dsgr / SurvSr Tech /Sr ObservTechnician / ObservorTwo Person Survey CrewOne Person Survey CrewTask 3 Garland Circle - 100% Design Submittal 6 36 17 35 0 0 0 0 94 11,150$ <br />19 Final Title Sheet/obtain signatures of PWD 1 1 220$ <br />20 Finalize Index Sheet with Pertinent Utility Information 2 210$ <br />21 Typical Cross Sections 1 2 325$ <br />22 Finalize MOT / Signage 1 2 325$ <br />23 Final Plan and Profile showing final proposed 2 4 8 1,550$ <br />24 Final cross sections proposed 1 2 4 775$ <br />25 Final Erosion Control Plans / SWPPP 2 6 880$ <br />26 Final details, structure table/ incidental work 1 2 2 565$ <br />27 Final Quantity Calcs and Cost Estimates 2 2 440$ <br />28 Finalize Specifications 2 12 1,840$ <br />29 Project Management / Coord with City 2 6 1,090$ <br />30 Final Utility Coord. (Conflict Analysis, Workplan, Approvals)4 500$ <br />31 QA/QC time 2 4 2 1,050$ <br />32 Mtg with City review (virtual)2 2 480$ <br />33 Compliance with City at 100% Review / Revisions 2 2 4 900$ <br />-$ <br />Task 4 Garland Circle - Bidding Phase 0 10 2 6 0 0 0 0 18 2,110$ <br />34 Precon Conference (virtual)2 2 480$ <br />35 Assist Questions & Addendums 6 4 1,170$ <br />36 Bid Tabulation 2 2 460$ <br />-$ <br />Task 5 Garland Circle - Construction Phase 0 8 0 0 0 0 0 0 8 1,000$ <br />37 Review Shop Drawings 4 500$ <br />38 Respond to Contractors Questions 4 500$ <br />-$ <br />Totals 10 90 43 79 0 0 0 0 222 43,800$ <br />22-1166 South Bend - Small Drainage Projects - Garland Cir 09-01-22 2 of 3