My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design Services 2023 Small Drainage Improvements Proj No. 123-006 – A&Z Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design Services 2023 Small Drainage Improvements Proj No. 123-006 – A&Z Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2022 4:05:41 PM
Creation date
10/11/2022 4:05:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/11/2022
Text box
ID:
1
Creator:
Created:
10/11/2022 4:05 PM
Modified:
10/11/2022 4:05 PM
Text:
Attachment A
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Client: South Bend <br />Project: Small Drainage Projects - Garland Circle <br />Project No.: 22-1166 <br />Manhour Budget Principle / Sr Proj MgrSr. Proj Engr / PM/ Sr. ConsultantSr Engr / Sr Dsgr / Sr Surv.Engr / Dsgr / SurvSr Tech /Sr ObservTechnician / ObservorTwo Person Survey CrewOne Person Survey CrewTask Description Totals Total Fee <br />Task 1 Garland Circle - Topo Survey / Drainage Study 4 18 52 20 0 0 34 12 140 17,610$ <br />1 Review record documents 2 2 480$ <br />2 Uility locates / research / property lines 2 6 2 4 1,680$ <br />3 Topo survey / strucutre data / utilities 32 8 5,800$ <br />4 Survey cleanup and exisitng site drawing, pipe networks 16 1,840$ <br />5 Site visit PM/Designer with existing site verification 6 6 1,380$ <br />6 Drainage modeling build existing conditions / shed delineation 2 16 2 2,300$ <br />7 Drainage modeling proposed alternates / options 2 6 940$ <br />8 Draft Drainage report / recommendations / cost estimates 2 2 8 4 1,930$ <br />9 Mtg with City review (virtual)2 2 480$ <br />10 Final Drainage report / recommendations / cost estimates 2 2 2 780$ <br />-$ <br />-$ <br />Task 2 Garland Circle - 50% Design Submittal 4 36 24 38 0 0 0 0 102 11,930$ <br />1 Title Sheet 2 210$ <br />2 Index Sheet 2 210$ <br />3 Preliminary Typical Cross Sections 1 2 325$ <br />4 Preliminary MOT / Signage 1 2 325$ <br />5 Plan and Profile showing exist./ preliminary proposed 4 8 8 2,260$ <br />6 Preliminary cross sections existing /proposed 2 2 440$ <br />7 Preliminary Erosion Control Plans & SWPPP 2 4 650$ <br />9 Miscellaneous details, structure table/ incidental work 2 4 650$ <br />11 Preliminary Quantity Calcs and Cost Estimates 4 500$ <br />12 Preliminary Unique Special Provisions and Specifications 8 1,000$ <br />13 Site Visit 6 6 1,380$ <br />14 Project Management / Coord with City 2 8 1,340$ <br />15 Initiate Utility Coordination (Design Inquiry and Verification)4 2 670$ <br />16 QA/QC time 2 2 590$ <br />17 Mtg with City review (virtual)2 2 480$ <br />18 Compliance with City at 50% Review / Revisions 2 2 4 900$ <br />-$ <br />22-1166 South Bend - Small Drainage Projects - Garland Cir 09-01-22 1 of 3
The URL can be used to link to this page
Your browser does not support the video tag.