My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design Services 2023 Small Drainage Improvements Proj No. 123-006 – A&Z Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design Services 2023 Small Drainage Improvements Proj No. 123-006 – A&Z Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2022 4:05:41 PM
Creation date
10/11/2022 4:05:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 <br />(Exhibit A – Engineer ’ s Ser vices) <br />EJCDC E-500 Agr eement Between Owner and Engineer for Pr ofessional Ser vices <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reser ved. <br />b.Communicate to Owner of Utility concerns and relocation needs and modify plans to <br />accommodate utilities if feasible. <br />c.Identify any required temporary or permanent easements which may be required. <br />6.Furnish 2 review copies of the Preliminary Design Phase documents and any other <br />deliverables to Owner within 60 calendar days of authorization to proceed with this <br />phase, and review them with Owner. Within 21 calendar days of receipt, Owner shall <br />submit to Engineer any comments regarding the Preliminary Design Phase documents and <br />any other deliverables. <br />7.Revise the Preliminary Design Phase documents and any other deliverables in response to <br />Owner’s comments, as appropriate, and furnish to Owner 1 copies of the revised <br />Preliminary Design Phase documents, revised opinion of probable Construction Cost, and <br />any other deliverables within 14 calendar days after receipt of Owner’s comments. <br />B.Engineer’s services under the Preliminary Design Phase will be considered complete on the date <br />when the revised Preliminary Design Phase documents, revised opinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />A1.03 Final Design Phase (100% Plans with Bidding Documents – Garland Circle) <br />A.After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of <br />probable Construction Cost as determined in the Preliminary Design Phase, and any other <br />deliverables subject to any Owner-directed modifications or changes in the scope, extent, <br />character, or design requirements of or for the Project, and upon written authorization from Owner, <br />Engineer shall: <br />1.Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br />Work to be performed and furnished by Contractor. <br />2.Provide technical criteria, written descriptions, and design data for Owner’s use in filing <br />applications for permits from or approvals of governmental authorities having jurisdiction <br />to review or approve the final design of the Project; assist Owner in consultations with such <br />authorities; and revise the Drawings and Specifications in response to directives from such <br />authorities. <br />3.Advise Owner of any adjustments to the opinion of probable Construction Cost known to <br />Engineer. <br />4.Perform or provide the following additional Final Design Phase tasks or deliverables: <br />a.Utility Coordination: Submit project final plans to utility companies for information <br />and final relocation plan coordination. <br />5.Prepare and furnish bidding documents for review by Owner, its legal counsel, and other <br />advisors, within 30 calendar days of authorization to proceed with this phase, and <br />review them with Owner. Within 21 days of receipt, Owner shall submit to Engineer
The URL can be used to link to this page
Your browser does not support the video tag.