Laserfiche WebLink
Page 3 <br />(Exhibit A – Engineer ’ s Ser vices) <br />EJCDC E-500 Agr eement Between Owner and Engineer for Pr ofessional Ser vices <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reser ved. <br />b.Communicate to Owner of Utility concerns and relocation needs and modify plans to <br />accommodate utilities if feasible. <br />c.Identify any required temporary or permanent easements which may be required. <br />6.Furnish 2 review copies of the Preliminary Design Phase documents and any other <br />deliverables to Owner within 60 calendar days of authorization to proceed with this <br />phase, and review them with Owner. Within 21 calendar days of receipt, Owner shall <br />submit to Engineer any comments regarding the Preliminary Design Phase documents and <br />any other deliverables. <br />7.Revise the Preliminary Design Phase documents and any other deliverables in response to <br />Owner’s comments, as appropriate, and furnish to Owner 1 copies of the revised <br />Preliminary Design Phase documents, revised opinion of probable Construction Cost, and <br />any other deliverables within 14 calendar days after receipt of Owner’s comments. <br />B.Engineer’s services under the Preliminary Design Phase will be considered complete on the date <br />when the revised Preliminary Design Phase documents, revised opinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />A1.03 Final Design Phase (100% Plans with Bidding Documents – Garland Circle) <br />A.After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of <br />probable Construction Cost as determined in the Preliminary Design Phase, and any other <br />deliverables subject to any Owner-directed modifications or changes in the scope, extent, <br />character, or design requirements of or for the Project, and upon written authorization from Owner, <br />Engineer shall: <br />1.Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br />Work to be performed and furnished by Contractor. <br />2.Provide technical criteria, written descriptions, and design data for Owner’s use in filing <br />applications for permits from or approvals of governmental authorities having jurisdiction <br />to review or approve the final design of the Project; assist Owner in consultations with such <br />authorities; and revise the Drawings and Specifications in response to directives from such <br />authorities. <br />3.Advise Owner of any adjustments to the opinion of probable Construction Cost known to <br />Engineer. <br />4.Perform or provide the following additional Final Design Phase tasks or deliverables: <br />a.Utility Coordination: Submit project final plans to utility companies for information <br />and final relocation plan coordination. <br />5.Prepare and furnish bidding documents for review by Owner, its legal counsel, and other <br />advisors, within 30 calendar days of authorization to proceed with this phase, and <br />review them with Owner. Within 21 days of receipt, Owner shall submit to Engineer