Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> Page 2 of 7 4175 New Vision Drive ● Fort Wayne, IN 46845 ● 260-490-1025 ● www.eri.consulting <br /> <br />EXCLUSIONS <br /> <br />Any services not listed in the Project Understanding above are currently excluded from our project scope. Examples of <br />services not included in the proposed scope that would be considered Additional Services are as follows, but not limited <br />to: <br /> <br />a. Electronic (AutoCad) file of site drawings and details (all construction documents will be provided in .pdf format for <br />your use in reproduction). <br />b. As-built Survey (we assume that the existing conditions were consistent with the previously developed design <br />plans). <br />c. Site Lighting and electrical utility (assumed to not be required). <br />d. Geotechnical Engineering services (we assume that all existing stone subbase was placed on adequately compacted <br />subgrade). <br />e. Permitting (assumed to not be required for this portion of the project). <br />f. Land Surveying Services (any required easement documents, additional topography, or legal descriptions will be <br />provided by others). <br />g. Public Road improvement design (assumed to not be required for this project). <br />h. Site Irrigation Design (assumed to be provided by others if required). <br />i. Site Utilities (assumed to not be required with this portion of the project). <br />j. Confirmation of Bid Item quantities (provided by the City) <br />k. Bidding Assistance (provided by the City) <br /> <br /> <br />REIMBURSABLE SERVICES <br /> <br />The following services will be billed on a time and materials basis in addition to the basic agreement according to the <br />attached fee schedule: <br /> <br />a. Printing, copying, and distribution expenses. We will submit original drawings and specifications to Eastern <br />Engineering for reproduction and forward the invoice to your office for processing. <br /> <br /> <br />SCHEDULE <br /> <br />We will commence the services described above upon execution of this proposal and will work with your office to produce <br />final bidding documentation. We anticipate that our scope of work will take two weeks to complete. <br /> <br /> <br />