Laserfiche WebLink
BID TABULATION <br />Morris Performing Arts Center - Main Level Slab Replacement <br />Project No: 121-029A <br />Project Title <br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost <br />1 <br />Complete demolition, including: walls (full and partial), doors/windows, concrete step, ceiling systems, <br />electrical, and mechanical components as noted on the demolition drawings.1 LS $26,750.00 $26,750.00 $29,575.00 $29,575.00 $40,000 $40,000.00 <br />2 <br />New wall infill, new ceiling, and new finishes throughout Box Office Lobby and Box Office (including <br />paint; trim at walls, openings and columns; installation of in-stock CPT1; floor leveling at CT2 transition <br />to match existing ramp condition; SS1 at storefront bay ledges)1 LS $93,000.00 $93,000.00 $150,047.00 $150,047.00 $235,600.00 $235,600.00 <br />3 New exterior storefront Box Office window systems (including countertop at office desk)1 LS $23,600.00 $23,600.00 $17,162.00 $17,162.00 $15,000.00 $15,000.00 <br />4 New interior Box Office Window system (including countertop and surrounding trim)1 LS $18,000.00 $18,000.00 $44,027.00 $44,027.00 $35,000.00 $35,000.00 <br />5 Mechanical work as required in Box Office Lobby (not limited to: rerouting ductwork as necessary, etc.) 1 LS $5,500.00 $5,500.00 $19,556.00 $19,556.00 $10,000.00 $10,000.00 <br />6 <br />Electrical renovations as required in the Box Office Lobby and Box Office (not limited to relocating <br />wiring and access panel, light fixture replacements, etc.)1 LS $22,800.00 $22,800.00 $23,196.00 $23,196.00 $25,000.00 $25,000.00Total$189,650.00 $283,563.00 $360,600.00 <br />I hereby certify that the above truly and accurately represents bids received for this project on July 26, 2022. <br />Becca Plantz, Project Engineer <br />The Robert Henry Corp. <br />Y <br />Engineer's Estimate Larson Danielson Construction Co., Inc. <br />Non-Collusion Affadavit Y <br />S:\Public Works\Projects\Projects by Year\2021 Projects\121-029 Morris Performing Arts Center 100-Yr\1 - Admin\1 - BPW Documents\Box Office\Bid Tabulation 121-029C