My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - Lawson-Fisher Associates P.C.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - Lawson-Fisher Associates P.C.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 1:30:25 PM
Creation date
8/23/2022 1:30:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend | CE Services for Coal Line Trail Phase IIB (Des # 2200199) in the LaPorte District | Page 3LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C. <br />PROJECT SUPERVISOR <br />Certifications <br /> Bituminous Paving <br /> Bridge Construction/Deck Repair <br /> Concrete Paving <br /> Traffic, Miscellaneous Concrete, and Miscellaneous <br />Construction Items <br /> Construction Layout/Measurement and Pipe <br />Structures <br /> Construction Earthwork <br /> INDOT PE/PS Training <br /> Competent Trenching & Excavation <br /> INDOT Storm Water Certification <br />Construction Project Types <br /> Roadway Construction/Reconstruction/Resurfacing/ <br />Roundabouts <br /> Concrete Pavement Restoration <br /> Sanitary/Storm Sewers/Watermain <br /> Traffic Signals <br /> Utility Relocations <br /> Intersection Improvements <br /> ADA and Curb Ramp Reconstruction <br />Past Project Experience <br /> Coal Line Trail (Phase I) — South Bend <br /> Shared Use Path — CR 8 — Elkhart County <br /> North Oakland Avenue, Nappanee <br /> Boston/Larson Street, LaPorte <br /> SR 23 over Koontz Lake Dam, Road and Bridge <br />Reconstruction, INDOT and DNR <br /> Old Darden Road Bridge over St. Joseph River — St. <br />Joseph County <br /> Edison and Ash Road Roundabout — St. Joseph <br />County <br /> County Bridge 12 over Geyer Ditch — St. Joseph <br />County <br /> LaSalle Trail (Phase I) — St. Joseph County <br /> Hospice Site Infrastructure, Mishawaka <br /> US 30 over Hunsley Ditch — INDOT <br />Ric’s Focus for the Success of <br />This Project: <br /> Monitoring construction sequencing and utility <br />coordination progress. <br /> Oversee Waterway Permitting Requirements <br /> Ensuring compliance to ADA requirements. <br /> Intentional and consistent communication with <br />project partners and impacted residents. <br />Jon "Ric" Riemke, PE <br />Senior Construction Engineer <br />Ric’s areas of experience and knowledge <br />include: <br />LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C. <br />LFA and Ric Riemke have significant knowledge <br />coordinating work with LPA Projects involving <br />trails and bridges and will apply this experience <br />to the success of the City of South Bend's project. <br />Jon "Ric" Riemke, PE will be the Senior <br />Construction Engineer for this <br />Construction Inspection project. <br />With over 32 years of experience in the <br />engineering construction industry, Ric has been involved <br />in numerous multi-use paths, road rehabilitation projects <br />involving turn lanes with traffic signals, and various <br />roadway construction projects requiring extensive <br />utility relocations. Ric has supervised projects of various <br />sizes and types and is certified in all INDOT testing <br />requirements. He has managed multiple local and state <br />funded projects. <br />Ric’s experience in various multi-use path projects, will <br />be critical to the success of Phase IIB of the Coal Line <br />Trail project. <br />Relevant Trail Experience: <br /> Coal Line Trail (Phase I) — South Bend <br /> LaSalle Trail (Phase I) from Cleveland Road to <br />Darden Road — St. Joseph County, Indiana <br /> CR 8 Shared Use Path — Elkhart,Indiana <br /> North Oakland Avenue — Nappanee, Indiana <br />Coal Line Trail (Phase I)LaSalle Trail <br />North Oakland AvenueCR 8 Shared Use Path
The URL can be used to link to this page
Your browser does not support the video tag.