Laserfiche WebLink
CITY OF SOUTH BEND CE SERVICES: COAL LINE TRAIL PHASE IIB DES #2200199 4 <br />Project Team: Key Staff & Qualifications <br />10 <br />YEARS <br />Matthew’s Relevant Experience <br />(images below with corresponding numbers) <br />Matthew Curry RESIDENT PROJECT REPRESENTATIVE (RPR) <br />•INDOT RPR <br />•INDOT Tester <br />•INDOT Technician #257451 <br />•INDOT Site Manager ID: MCurry <br />•INDOT Submitter #4985 <br />•Confined Space Certification <br />As one of A&Z’s Resident Project Representatives,Matthew comes with 10 <br />years experience collaborating on INDOT/LPA funded projects.Matthew’s <br />daily responsibilities include <br />•Monitoring daily construction activities <br />•Testing materials <br />•Preparing daily construction drawings and reports <br />•Maintaining communication with owners,utilities,and the public <br />•Tracking Materials and Quantities <br />He is well versed in a variety of construction management programs <br />including INDOT’s Site Manager Construction System. <br />Jason Pace <br />•B.S. Construction <br />Engineering: Purdue FW <br />•INDOT Certified Tester <br />•INDOT Certified RPR <br />Jason has been with A&Z since he was an intern in 2018. He has proven <br />himself to be a valuable member of our team and is consistently on the job <br />early and often to check traffic control and signs. His responsibilities <br />include <br />•Monitoring Construction Activities <br />•Testing Materials <br />•Record Keeping <br />•Maintaining Field Data for Federally Funded Projects <br />INSPECTOR, Assistant Resident Project Representative <br />•On-Call Construction Inspection Terminal Apron <br />Improvements | Fort Wayne Allen County Airport Authority <br />•Maplecrest Road Improvements | Fort Wayne, IN |DES <br />#1173162 <br />•Pufferbelly Trail |Fort Wayne, IN | DES #1600772 $1.65 M <br />Const. Cost <br />•Winona Lake Roundabout | Winona Lake, IN | DES #1600788 <br />4 <br />YEARS <br />40 <br />HOURS OSHA FALL <br />PROTECTION TRAINING <br />4312 <br />The Town of Winona Lake is …very satisfied and impressed with the work A&Z Engineering has done...from <br />feasibility studies to preliminary design and construction inspection.Their work has been especially <br />helpful in planning for future transportation and infrastructure needs.A&Z has also assisted the Town in <br />grant applications and presentation that have been very well received and lead to grant awards. <br />Craig Allebach <br />Town Coordinator <br />Coming together is the beginning. Staying together is progress. Working together is success. <br />40 <br />HOURS OSHA FALL <br />PROTECTION TRAINING <br />Jason’s Relevant Experience <br />•Pufferbelly Trail | Fort Wayne, IN | DES #1600772 | <br />$1.65M Const. Cost | Image 1 <br />•Heritage Trail | Winona Lake, IN | DES #0810409 | $.94M <br />Const. Cost | Image 2 <br />•US 30 Bridge Rehabilitation | Warsaw, IN | DES <br />#1296379; #1296380; #1296374; #1296736; #1296377; <br />#1296378 | $1.6M Const. Cost | Image 3 <br />•Bridge Painting | Lafayette, IN | DES #2001070; <br />#2001073; # 2001074 | $.45M Const. Cost | Image 4