Laserfiche WebLink
SOUTH BEND 2022 CCMG ROAD REHABILITATION - SOUTHLEA DRIVE Page 1 of 1 <br />CITY OF SOUTH BEND PROJECT NUMBER: 122-024R <br />BID TABULATION SHEET <br />Prepared by: A&Z Engineering Bid Date: 8/04/2022 <br />$910,000.00 $975,185.60 $0.00 <br />$184,583.00 $249,768.60 $0.00 <br />$0.00 $0.00 $725,417.00 <br />25.4%34.4%0.0% <br />0.0%0.0%100.0% <br />Bid Form, All Pages <br />Form 96 <br />Financial Statement <br />Bid Bond <br />DIVISION 2A - SOUTHLEA DRIVE BASE BID (FROM LILAC DR. TO EASTMONT DR.) <br />Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension <br />1 Common Excavation 1096 CYS $25.00 $27,400.00 $76.00 $83,296.00 $50.00 $54,800.00 $0.00 <br />2 Concrete, Remove 4063 SYS $14.00 $56,882.00 $11.00 $44,693.00 $20.00 $81,260.00 $0.00 <br />3 Subgrade Treatment Type II 1317 SYS $14.00 $18,438.00 $23.00 $30,291.00 $25.00 $32,925.00 $0.00 <br />4 Compacted No. 53 Subbase 1629 TON $29.00 $47,241.00 $30.00 $48,870.00 $38.00 $61,902.00 $0.00 <br />5 Sidewalk, Concrete 354 SYS $108.00 $38,232.00 $143.00 $50,622.00 $170.00 $60,180.00 $0.00 <br />6 Curb Ramp, Concrete 135 SYS $280.00 $37,800.00 $225.00 $30,375.00 $300.00 $40,500.00 $0.00 <br />7 Milling, Concrete, 2 In.22 SYS $20.00 $440.00 $220.00 $4,840.00 $160.00 $3,520.00 $0.00 <br />8 Milling, 4 In.22 SYS $0.00 $0.00 $0.00 $0.00 <br />9 HMA Surface, 9.5 mm - Type B 335 TON $115.00 $38,525.00 $119.00 $39,865.00 $120.00 $40,200.00 $0.00 <br />10 HMA Intermediate, 12.5 mm - Type B 559 TON $105.00 $58,695.00 $111.00 $62,049.00 $112.00 $62,608.00 $0.00 <br />11 HMA Base, 25.0 mm - Type B 894 TON $100.00 $89,400.00 $94.00 $84,036.00 $95.00 $84,930.00 $0.00 <br />12 Tack Coat 3 TON $500.00 $1,500.00 $1.00 $3.00 $1.00 $3.00 $0.00 <br />13 Joint Adhesive, Surface 1366 LFT $2.00 $2,732.00 $1.00 $1,366.00 $1.20 $1,639.20 $0.00 <br />14 PCCP for Approaches, 6 in.531 SYS $82.00 $43,542.00 $158.00 $83,898.00 $200.00 $106,200.00 $0.00 <br />15 Combined Curb & Gutter, Type A 2710 LFT $30.00 $81,300.00 $58.00 $157,180.00 $42.00 $113,820.00 $0.00 <br />16 Sodding, Nursery 978 SYS $9.00 $8,802.00 $32.50 $31,785.00 $22.80 $22,298.40 $0.00 <br />17 Adjust Manhole Casting to Grade 9 EA $888.00 $7,992.00 $1,500.00 $13,500.00 $300.00 $2,700.00 $0.00 <br />18 Adjust Water Valve Box to Grade 5 EA $686.00 $3,430.00 $350.00 $1,750.00 $200.00 $1,000.00 $0.00 <br />19 Furnish and Adjust Casting to Grade 9 EA $1,964.00 $17,676.00 $2,200.00 $19,800.00 $1,300.00 $11,700.00 $0.00 <br />20 Fire Hydrant Assembly 1 EA $7,500.00 $7,500.00 $10,600.00 $10,600.00 $14,650.00 $14,650.00 $0.00 <br />21 Water Main Lowering, 6" DI 100 LFT $200.00 $20,000.00 $215.00 $21,500.00 $250.00 $25,000.00 $0.00 <br />22 Mailbox Assembly, Remove & Reset 29 EA $210.00 $6,090.00 $400.00 $11,600.00 $350.00 $10,150.00 $0.00 <br />23 Construction Engineering 1 LS $13,600.00 $13,600.00 $2,800.00 $2,800.00 $10,000.00 $10,000.00 $0.00 <br />24 Mobilization and Demobilization 1 LS $33,900.00 $33,900.00 $36,781.00 $36,781.00 $60,000.00 $60,000.00 $0.00 <br />25 Clearing Right of Way 1 LS $13,600.00 $13,600.00 $10,000.00 $10,000.00 $15,000.00 $15,000.00 $0.00 <br />26 Maintenance of Traffic 1 LS $33,900.00 $33,900.00 $12,000.00 $12,000.00 $30,000.00 $30,000.00 $0.00 <br />27 Erosion Control 1 LS $6,800.00 $6,800.00 $900.00 $900.00 $3,000.00 $3,000.00 $0.00 <br />28 Water Main Line Stop, 6 in.2 EA $5,000.00 $10,000.00 $7,800.00 $15,600.00 $12,600.00 $25,200.00 $0.00 <br />TOTAL BASE BID $725,417.00 $910,000.00 $975,185.60 $0.00 <br />Date:8/5/2022 <br />Nitin Timble, P.E. <br />I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this <br />project. <br />Yes <br />Yes <br />Yes <br />Yes <br />N/A <br />N/A <br />N/A <br />N/A <br />Yes <br />Yes <br />Yes <br />Yes <br />% over <br />% Under <br />Milestone Contractors North, Inc.Reith-Riley Construction Co., Inc <br />Amount Over <br />Amount Under <br />Engineer's Estimate <br />$725,417.00Base Bids Total