Laserfiche WebLink
SOUTH BEND 2022 CCMG ROAD REHABILITATION - JACKSON ROAD Page 1 of 1 <br />CITY OF SOUTH BEND PROJECT NUMBER: 122-024R <br />BID TABULATION SHEET <br />Prepared by: A&Z Engineering Bid Date: 8/04/2022 <br />$1,411,000.00 $1,685,802.65 $0.00 <br />$0.00 $91,205.65 $0.00 <br />$183,597.00 $0.00 $1,594,597.00 <br />0.0%5.7%0.0% <br />11.5%0.0%100.0% <br />Bid Form, All Pages <br />Form 96 <br />Financial Statement <br />Bid Bond <br />DIVISION 5 - JACKSON ROAD BASE BID (FROM FELLOWS ST. TO MIAMI ST.) <br />Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension <br />1 Common Excavation 4610 CYS $36.00 $165,960.00 $42.00 $193,620.00 $38.00 $175,180.00 $0.00 <br />2 Concrete, Remove 748 SYS $60.00 $44,880.00 $32.00 $23,936.00 $48.00 $35,904.00 $0.00 <br />3 No. 2 Stone 1247 TON $55.00 $68,585.00 $33.00 $41,151.00 $56.00 $69,832.00 $0.00 <br />4 Subgrade Treatment Type II 2799 SYS $19.00 $53,181.00 $20.00 $55,980.00 $20.00 $55,980.00 $0.00 <br />5 Geogrid, Type 1B 2243 SYS $3.00 $6,729.00 $3.00 $6,729.00 $3.60 $8,074.80 $0.00 <br />6 Compacted No. 53 Subbase 3977 TON $27.00 $107,379.00 $28.00 $111,356.00 $34.00 $135,218.00 $0.00 <br />7 Compacted Aggregate, No. 53 519 TON $53.00 $27,507.00 $42.00 $21,798.00 $56.00 $29,064.00 $0.00 <br />8 Milling, Asphalt, 1.5 In.703 SYS $5.00 $3,515.00 $16.00 $11,248.00 $17.00 $11,951.00 $0.00 <br />9 HMA Surface, 9.5 mm - Type B 761 TON $115.00 $87,515.00 $113.00 $85,993.00 $120.00 $91,320.00 $0.00 <br />10 HMA Intermediate, 12.5 mm - Type B 1289 TON $105.00 $135,345.00 $99.00 $127,611.00 $112.00 $144,368.00 $0.00 <br />11 HMA Base, 25.0 mm - Type B 4260 TON $100.00 $426,000.00 $80.00 $340,800.00 $95.00 $404,700.00 $0.00 <br />12 HMA for Approaches, Type B 77 TON $195.00 $15,015.00 $205.00 $15,785.00 $200.00 $15,400.00 $0.00 <br />12A Tack Coat 6 LFT $500.00 $3,000.00 $1.00 $6.00 $1.00 $6.00 $0.00 <br />12B Joint Adhesive, Surface 3730 SYS $2.00 $7,460.00 $1.00 $3,730.00 $1.20 $4,476.00 $0.00 <br />13 PCCP for Approaches, 9 in. 34 SYS $142.00 $4,828.00 $135.00 $4,590.00 $250.00 $8,500.00 $0.00 <br />14 PCCP for Approaches, 6 in. 347 LFT $96.00 $33,312.00 $147.00 $51,009.00 $150.00 $52,050.00 $0.00 <br />15 Combined Curb and Gutter, Type B 654 SYS $35.00 $22,890.00 $47.00 $30,738.00 $55.00 $35,970.00 $0.00 <br />16 Sodding, Nursery 1544 TON $6.00 $9,264.00 $23.00 $35,512.00 $22.80 $35,203.20 $0.00 <br />17 HMA for Temporary Pavement, Type B 374 LFT $284.00 $106,216.00 $170.00 $63,580.00 $295.00 $110,330.00 $0.00 <br />18 Temporary Pavement Marking, Type 1, Solid, Yellow, 4 In.3314 LFT $1.00 $3,314.00 $1.15 $3,811.10 $1.15 $3,811.10 $0.00 <br />19 Temporary Pavement Marking, Type 1, Solid, White, 4 In.3840 LFT $1.00 $3,840.00 $1.15 $4,416.00 $1.15 $4,416.00 $0.00 <br />20 Line Remove 115 LFT $1.00 $115.00 $1.25 $143.75 $1.25 $143.75 $0.00 <br />21 Temporary Pavement Marking, Type 1, Dotted, Yellow, 4 In.40 LFT $1.00 $40.00 $2.95 $118.00 $2.95 $118.00 $0.00 <br />22 Temporary Pavement Marking, Type 1, Dotted, White, 4 In.40 LFT $1.00 $40.00 $2.95 $118.00 $2.95 $118.00 $0.00 <br />23 Line, Thermoplastic, Solid, Yellow, 4 in.506 LFT $1.00 $506.00 $1.70 $860.20 $1.70 $860.20 $0.00 <br />24 Line, Thermoplastic, Broken, Yellow, 4 in.560 LFT $1.00 $560.00 $1.88 $1,052.80 $1.88 $1,052.80 $0.00 <br />25 Line, Thermoplastic, Solid, White, 4 in. 4512 LFT $1.00 $4,512.00 $1.70 $7,670.40 $1.70 $7,670.40 $0.00 <br />26 Transverse Marking, Thermoplastic, Stop Line, 24 in. 17 LFT $13.00 $221.00 $11.45 $194.65 $11.45 $194.65 $0.00 <br />27 Grooving for Pavement Markings, 4 in.5578 LFT $1.00 $5,578.00 $1.18 $6,582.04 $1.18 $6,582.04 $0.00 <br />28 Signal Cable, Roadway Loop, Copper, 1C/14 GA 225 LFT $2.00 $450.00 $0.65 $146.25 $0.65 $146.25 $0.00 <br />29 Detector Housing, Remove 1 EA $650.00 $650.00 $320.00 $320.00 $320.00 $320.00 $0.00 <br />30 Signal Detector Housing 1 EA $1,300.00 $1,300.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $0.00 <br />31 Saw Cut for Roadway Loop Detector and Sealant 114 LFT $35.00 $3,990.00 $15.00 $1,710.00 $15.00 $1,710.00 $0.00 <br />32 Construction Engineering 1 LS $42,500.00 $42,500.00 $8,184.81 $8,184.81 $10,000.00 $10,000.00 $0.00 <br />33 Mobilization and Demobilization 1 LS $70,800.00 $70,800.00 $70,000.00 $70,000.00 $90,000.00 $90,000.00 $0.00 <br />34 Clearing Right of Way 1 LS $28,400.00 $28,400.00 $10,000.00 $10,000.00 $23,432.46 $23,432.46 $0.00 <br />35 Maintenance of Traffic 1 LS $85,000.00 $85,000.00 $61,900.00 $61,900.00 $80,000.00 $80,000.00 $0.00 <br />36 Erosion Control 1 LS $14,200.00 $14,200.00 $7,600.00 $7,600.00 $30,700.00 $30,700.00 $0.00 <br />TOTAL BASE BID $1,594,597.00 $1,411,000.00 $1,685,802.65 $0.00 <br />Date:8/5/2022 <br />Nitin Timble, P.E. <br />Amount Over <br />Amount Under <br />Engineer's Estimate <br />$1,594,597.00Base Bids Total <br />% over <br />% Under <br />Milestone Contractors North, Inc.Rieth-Riley Construction Co., Inc <br />Yes <br />Yes <br />Yes <br />Yes <br />N/A <br />N/A <br />N/A <br />N/A <br />Yes <br />Yes <br />Yes <br />Yes <br />I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this <br />project.