My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinfection Improvements Proj No. 119-069A - Bowen Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order No 3 - WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinfection Improvements Proj No. 119-069A - Bowen Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2022 1:26:58 PM
Creation date
7/26/2022 1:26:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/26/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 2 <br /> 8802 North Meridian Street • Indianapolis, IN 46260 • 317.842.2616 phone • www.BowenEngineering.com <br />April 18, 2021 <br />(E-Mail) <br />Benjamin Burroughs <br />Water Resource Engineer <br />Arcadis U.S., Inc. <br />150 West Market Street Suite 278 <br />Indianapolis, IN 46204 <br />RE: South Bend WWTP Upgrades <br />Bowen Project # 15-21-008 <br />RE: RFQ-014 – Backside Aeration Sludge Removal <br />Dear Mr. Burroughs: <br />Bowen Engineering Corporation (BEC) is pleased to provide you with the following change request to remove <br />the sludge and grit from the entire backside aeration influent channel. This pricing includes haul off of 261,381 <br />gallons of biosolids. This pricing is inclusive of all Subcontractor, Labor, Equipment, and Materials to complete <br />the work as outlined in the RFQ. <br />Labor/Equipment: $6,646.00 <br />Material: $0 <br />Subcontractor: $57,365.56 <br />Markup on Additional: $3,865.18 <br />Bonds/Insurance: $746.64 <br />Allowance: $15,000.00 <br />Total Additional Cost: $53,623.3 8 <br />Fifty Three Thousand Six Hundred Twenty-Three Dollars and Thirty-Eight Cents <br />Clarifications/Scope of Work <br />- Price includes haul off of 261,381 gallons of biosolids <br />- Upon completion of project South Bend will receive certificate of disposal verifying proof of legal <br />disposal <br />- Plant supplied reuse water will be provided to BEC at no cost <br />- Biosolids will be pushed with a skid steer towards the pump in the channel <br />We look forward to the opportunity to review this proposal with you. If you have any questions regarding this
The URL can be used to link to this page
Your browser does not support the video tag.