My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinfection Improvements Proj No. 119-069A - Bowen Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order No 3 - WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinfection Improvements Proj No. 119-069A - Bowen Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2022 1:26:58 PM
Creation date
7/26/2022 1:26:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/26/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND <br />DEPARTMENT OF PUBLIC WORKS <br />PROJECT CHANGE ORDER <br />DATE: 07-13-2022 <br />PROJECT NO: 119-069A <br />PROJECT NAME: WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, and Disinfection <br />Improvements <br />CONTRACT DATE: 11/13/2020 Notice to Proceed <br />CHANGE ORDER NO. 003 <br />SUBJECT OF CHANGE ORDER: Scope of Work Changes and Credits including sludge removal, <br />electrical, instrumentation, pipe repairs, integration, contract <br />unit price quantity adjustments. See details. <br />All items completed substantially as planned. <br />See attached Comparison of Estimate for overruns and underruns. <br />The original contract sum $ 4,272,999.00 <br />Net change by previously authorized change orders $ 133,804.96 <br />The contract sum prior to this change order $ 4,406,803.96 <br />By this Change Order, the project amount is Increased <br />Decreased $ 68,781.27 <br />The new contract sum including this change order $ 4,475,585.23 <br />This Change Order represents a total change of 1.61 % <br />Total change for entire project 4.74 % <br />Original contracted completion date/time 05/17/2022 <br />Extension of date/time by previous change orders 0 days <br />Date/time extension by this change order 100 days (due to manufacturer delays) <br />New completion date/time 08/25/2022 <br />RECOMMENDED FOR APPROVAL <br />CONTRACTOR Construction Manager <br />CITY OF SOUTH BEND <br />BOARD OF PUBLIC WORKS <br />Approved Date: Contractor Signature <br /> <br />Printed Name and Title <br />Bowen Engineering Corporation <br />President <br />Company name <br />8802 North Meridian Street <br />Member <br />Address <br />Indianapolis, IN 46260 <br />Member <br />City, State, Zip Member <br />Member <br />Pat Stanford, Project Manager <br />07-18-2022 <br />July 26, 2022
The URL can be used to link to this page
Your browser does not support the video tag.