Laserfiche WebLink
BID TABULATION2022 Contractor Paving Round 2Project No: 122-032For Bids Due: June 28, 2022Base BidItem No. DescriptionQuantity Unit Unit Price Item Total Unit Price Item Total Unit Price Item Total1 Maintenance of Traffic1 LS 111,830.00$ 111,830.00$ 63,060.71$ 63,060.71$ 80,000.00$ 80,000.00$ 2 Mobilization and Demobilization1 LS 80.00$ 80.00$ 90,695.59$ 90,695.59$ 16,119.00$ 16,119.00$ 3 Milling, 2”2,960 SY 3.40$ 10,064.00$ 4.28$ 12,668.80$ 5.60$ 16,576.00$ 4 Milling, 3"45,114 SY 3.70$ 166,921.80$ 4.01$ 180,907.14$ 5.40$ 243,615.60$ 5 HMA Surface, 9.5 mm – Type B5,120 TONS 105.00$ 537,600.00$ 131.31$ 672,307.20$ 123.00$ 629,760.00$ 6 HMA Intermediate, 12.5mm - Type B3,720 TONS 91.00$ 338,520.00$ 117.85$ 438,402.00$ 110.00$ 409,200.00$ 7 HMA for Patching160 TONS 280.00$ 44,800.00$ 391.28$ 62,604.80$ 250.00$ 40,000.00$ 8 Tack Coat20 TONS 1.05$ 21.00$ 705.71$ 14,114.20$ 600.00$ 12,000.00$ 9 Joint Adhesive, Surface20,435 LF 1.20$ 24,522.00$ 0.73$ 14,917.55$ 1.40$ 28,609.00$ 10 Adjust Manhole to Grade14 EA 315.00$ 4,410.00$ 632.23$ 8,851.22$ 2,600.00$ 36,400.00$ 11 Adjust Water Valve Structure to Grade5 EA 160.00$ 800.00$ 512.63$ 2,563.15$ 170.00$ 850.00$ 12 Adjust Inlet to Grade10 EA 315.00$ 3,150.00$ 632.23$ 6,322.30$ 2,030.00$ 20,300.00$ 13 Line, Thermoplastic, Solid, White, 6"198 LF 2.00$ 396.00$ 2.56$ 506.88$ 2.55$ 504.90$ 14 Transverse Marking, Thermoplastic, Solid, White, 24" 46 LF 10.00$ 460.00$ 10.60$ 487.60$ 10.55$ 485.30$ 15 Concrete Curb Ramp, Removal1,461 SY 60.00$ 87,660.00$ 63.10$ 92,189.10$ 180.00$ 262,980.00$ 16 Concrete Curb Ramp, Installation1,461 SY 210.00$ 306,810.00$ 203.44$ 297,225.84$ 340.00$ 496,740.00$ 17 Concrete Curb, Replacement602 LF 21.00$ 12,642.00$ 79.86$ 48,075.72$ 160.00$ 96,320.00$ 18 Concrete Curb, Replacement (Undistributed)500 LF 22.00$ 11,000.00$ 79.73$ 39,865.00$ 160.00$ 80,000.00$ 19 Concrete Header, 6”w x 12”d35 LF 100.00$ 3,500.00$ 188.00$ 6,580.00$ 395.00$ 13,825.00$ 20 Milling, 1.5”13,036 SY 3.40$ 44,322.40$ 2.95$ 38,456.20$ 3.20$ 41,715.20$ 1,709,509.20$ 2,090,801.00$ 2,526,000.00$ M/WBE InclusionAddendum #1I hereby certify that the above truly and accurately represents bids received for this project on June 28, 2022Scott Kreeger, Project EngineerYYRieth Riley Construction Co., Inc. Milestone Contractors North, Inc.Y Does not meet goalsNon-Collusion AffadavitYYBASE BID TOTALEngineer's EstimateBid BondYYPage 1 of 1