Change Order Nos 4-7 & 9-15 - Coal Line Trail Proj No. 115-063 - INDOT & Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order Nos 4-7 & 9-15 - Coal Line Trail Proj No. 115-063 - INDOT & Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 2:50:03 PM
Creation date
7/12/2022 2:49:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br />Change Order 11 <br />Due to design error, the plans for inlet structures at the intersection of the Trail and Woodward <br />Avenue called for incorrect castings that would not be flush with the pavement and curb. This <br />change order is to replace the designed Type 7 “beehive” castings with Type 10 “curb box” <br />castings. The change order is participating with a total cost of $2,006.26. The City’s 20% share <br />of this is $401.25. <br /> <br />Change Order 12 <br />Due to design error, the fence between the trail and the parking lot of the Portage Plaza strip <br />mall was directed to be removed but not replaced. The City deemed it a necessary safety <br />measure to replace the fence, deterring vehicle traffic from entering the trail from the parking lot. <br />The work is necessary for safety and is deemed participating, with a total cost of $14,178.00. <br />The City’s 20% share of this is $2,835.60. <br /> <br />Change Order 13 <br />Due to design error, a 32” gap between the stairs and bridge structure at Portage Avenue was <br />instructed to be filled with topsoil and seeding, which would be very difficult to maintain. The City <br />and INDOT agreed to a proposed solution from the contractor that would fill the gap with <br />decorative boulders held in place by a 5” layer of concrete, which would provide an aesthetic but <br />non-attention grabbing infill at the stairs. The change order was not deemed part of the original <br />scope of work by INDOT and is non-participating. The cost to the City is $7,879.90. <br /> <br />Change Order 14 <br />Due to design error, there was no item for HMA patching in the contract. HMA Patching was <br />necessary along the boundary between the trail and the Portage Plaza parking lot, as well as <br />around the raised crossing at Woodward Avenue. Since this work was necessary to complete <br />the scope of the contract, this change is participating with a total cost of $22,470.00. The City’s <br />20% share of this is $4,494.00. <br /> <br />Change Order 15 <br />Change Orders 1, 2, and 3 were processed and approved by the Board of Public Works on <br />November 23rd, 2021, in the total amount of $178,895.51. These change orders covered, <br />respectively, a change of trail material from HMA to Concrete, change of service point type, and <br />change to color temperature of luminaires along the trail. Per direction of the INDOT Area <br />Engineer, the intention was for the City to pay 100% of the increase in cost for each new line <br />item. However, the new (non-participating) items needed a separate purchase order to be paid <br />for according to the correct cost-share. This change order corrects the amounts of cost share <br />between the City and INDOT. This change order does not create a net change to the project <br />and does not result in additional charge to the City. <br /> <br /> <br />The total increase to the overall project cost for the above change orders is $68,665.95 (4.2%). <br />The total additional cost to the City from these items is $29,921.77. The costs for all items have <br />been found to be within typical unit prices for similar work and are thus recommended by <br />Engineering. <br /> <br />This project is being funded out of the TIF River West Development fund, with DFO project code <br />PROJ-00000018. Engineering requests the Board of Public Works approve the change orders <br />subject to financial approvals. Engineering has submitted the funding request in PR-00017412. <br /> <br />The INDOT Change Order Summaries for all pertinent change orders are attached. If you have <br />any questions, please respond.