Change Order Nos 4-7 & 9-15 - Coal Line Trail Proj No. 115-063 - INDOT & Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order Nos 4-7 & 9-15 - Coal Line Trail Proj No. 115-063 - INDOT & Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 2:50:03 PM
Creation date
7/12/2022 2:49:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br /> <br /> <br />TO: Theresa Heffner, Clerk, Board of Public Works <br />FROM: Finn Cavanaugh, Project Engineer <br />SUBJECT: Project No. 115-063 Coal Line Trail – Phase I <br />Change Orders 4-7,9-15 <br />DATE: July 1, 2022 <br />Attached are Change Orders 4, 5, 6, 7, 9, 10, 11, 12, 13, 14, and 15 for the Coal Line Trail Phase <br />I project, INDOT DES#1401810. <br /> <br />Change Order 4 <br />Due to a design error, an outdated and incorrect special provision for the shade structures was <br />included in the bid specifications. This was corrected after fabrication had begun, thus additional <br />material and labor costs were required. This change results in an addition of $4,558.40 and is a <br />participating item, meaning the City would pay 20% of this cost, $911.68. <br /> <br />Change Order 5 <br />In 2021 additional design work was done to revise the trail alignment to match with the original <br />railroad, since at the time of original design the City had not acquired the full width of right-of- <br />way. This design change necessitated an update to the Stormwater Quality Control Plan. Since <br />the change of alignment was not part of the original contract, this change is non-participating <br />and the cost to the City is $1,712.00. <br /> <br />Change Order 6 <br />Michiana Area Council of Governments (MACOG) as the MPO for this project, requested that <br />pedestrian traffic counter loops be added to the project. These are also a participating line item <br />with an overall additional cost of $2,810.70. The City’s 20% share of this cost is $562.14. <br /> <br />Change Order 7 <br />Due to the aforementioned change in alignment, the tree clearing subcontractor was required to <br />stop work for a 4-month period, and resume clearing at a later time. As such the subcontractor <br />incurred remobilization costs that the City is responsible for. This is a non-participating item and <br />the cost to the City is $4,066.00. <br /> <br />Change Order 9 <br />This change order is for additional cost to replace traffic detector loops damage during milling of <br />Wilber Street at the intersection of the Trail and Lincoln Way West. This is a participating line <br />item with a total additional cost of $2,406.85. The City’s 20% share of this cost is $481.37. <br /> <br />Change Order 10 <br />Due to the aforementioned change in alignment, the contractor was required to do additional <br />construction engineering to adjust to the new alignment. Since this change in alignment was not <br />part of the original contract the change is non-participating and the cost to the City is $6,577.83. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.