Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2022 Curb and Sidewalk Construction — Round 1 <br />Project Number <br />For Bids Due <br />122-001 <br />July 121h, 2022 <br />Contractor Name: Se <br />DIVISION 2 <br />Construction Co.. Inc. <br />Item <br />No. <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />300 <br />SY <br />$66.00 <br />$19,800.00 <br />2 <br />CONCRETE SIDEWALK, 4 -IN <br />330 <br />SY <br />$94.25 <br />$31,102.50 <br />3 <br />CONCRETE CURB, REMOVE <br />1105 <br />LF <br />$65.60 <br />$72,488.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />CONCRETE APPROACH, REMOVE <br />1110 <br />LF <br />$63.65 <br />$70,651.50 <br />5 <br />34 <br />SY <br />$80.50 <br />$2,737.00 <br />6 <br />GRAVEL APPROACH, REMOVE <br />31 <br />SY <br />$50.00 <br />$1,550.00 <br />7 <br />BRICK APPROACH, REMOVE <br />12 <br />SY <br />$50.00 <br />$600.00 <br />8 <br />PCCP FOR APPROACHES, 6 -IN <br />81 <br />77 <br />SY$187.00 <br />SY <br />$60.50 <br />$15,147.00 <br />$4,658.50 <br />9 <br />CURB RAMP, REMOVE <br />10 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />30 <br />SY <br />$330.00 <br />$9,900.00 <br />11 <br />PAIRED PERPENDICULAR CURB RAMP <br />TOPSOIL AND SEEDING <br />47 <br />SY <br />$325.00 <br />$15,275.00 <br />12 <br />485 <br />SY <br />$25.00 <br />$12,125.00 <br />13 <br />TREE, REMOVE, 30 -IN <br />1 <br />EA <br />$2,550.00 <br />$2,550.00 <br />14 <br />STUMP, REMOVE <br />4 <br />EA <br />$300.00 <br />$1,200.00 <br />15 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM, 2 -IN TO 2.5 -IN <br />7 <br />EA <br />$1,075.00 <br />$7,525.00 <br />DIVISION 2 TOTAL $267,309.50 <br />Version 09/29/2021 Contractor's Bid for Public Works - 8 <br />