Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND. <br />Project Name: 2022 Curb and Sidewalk Construction — Round 1 '-"13 <br />Project Number: 122-001 <br />For Bids Due: July 1211, 2022 <br />Contractor Name: Selge Construction CO., Inc. <br />DIVISION 1 <br />Item <br />No. <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />800 <br />SY <br />$60.25 <br />$48,200.00 <br />2 <br />CONCRETE SIDEWALK, 4 -IN <br />860 <br />SY <br />$83.00 <br />$71,380.00 <br />3 <br />CONCRETE CURB, REMOVE <br />1585 <br />LF <br />$58.05 <br />$92,009.25 <br />4 <br />CONCRETE CURB, MODIFIED <br />CONCRETE APPROACH, REMOVE <br />1595 <br />98 <br />LF <br />$46.65 <br />$74,406.75 <br />5 <br />SY <br />$69.75 <br />$6,835.50 <br />6 <br />GRAVEL APPROACH, REMOVE <br />86 <br />SY <br />$40.00 <br />$3,440.00 <br />7 <br />ASPHALT APPROACH, REMOVE <br />37 <br />SY <br />$40.00 <br />$1,480.00 <br />8 <br />PCCP FOR APPROACHES, 6 -IN <br />252 <br />SY <br />$160.50 <br />$40,446.00 <br />9 <br />CURB RAMP, REMOVE <br />49 <br />SY <br />$99.75 <br />$4,887.75 <br />10 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />13 <br />SY <br />$360.00 <br />$4,680.00 <br />11 <br />PAIRED PERPENDICULAR CURB RAMP <br />40 <br />SY <br />$291.00 <br />$11,640.00 <br />12 <br />TOPSOIL AND SEEDING <br />1070 <br />SY <br />$22.25 <br />$23,807.50 <br />13 <br />TREE, REMOVE, 18 -IN <br />4 <br />EA <br />$840.00 <br />$3,360.00 <br />14 <br />TREE, REMOVE, 30 -IN <br />3 <br />EA <br />$1,150.00 <br />$3,450.00 <br />15 <br />STUMP, REMOVE <br />4 <br />EA <br />$350.00 <br />$795.00 <br />$1,400.00 <br />16 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM. 2 -IN TO 2.5 -IN <br />23 <br />EA <br />$18,285.00 <br />DIVISION 1 TOTAL $409,707.75 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />