Laserfiche WebLink
<br />Basin CSO 040, 041 Separation <br />Sewer <br />15" new storm sewer (975 lf), 18" new storm sewer (650 <br />lf), 24" new storm sewer (650 lf) on Pleasant Avenue; 24" <br />new storm sewer (700 lf) on Northside Blvd. <br />01/2027 12/2029 <br />Memorial Park RTB Below grade retention treatment basin and pumping <br />station with provisions for screening, <br />disinfection/dechlorination of overflow. Minimum size of <br />3.9 million gallons. <br />01/2030 12/2035 <br />CSO Basin 019 GSI Improvements Green Alley Improvements, Intersection Dry Wells. Green <br />stormwater infrastructure improvements within Basin <br />019 will provide for the capture of at least 20,000 <br />gallons for stormwater. <br />01/2030 12/2035 <br />CSO 001 Throttle Capacity <br />Improvement <br />Increase dry weather throttle pipe capacity to capture an <br />additional 27 MGD <br />03/2030 12/2035 <br />CSO Basin 039, 040 GSI <br />Improvements <br />GSI unit drain improvements along Pleasant Avenue. <br />Green stormwater infrastructure improvements <br />within Basins 039 and 040 will provide for the <br />capture of at least 14,500 gallons for stormwater. <br />03/2030 12/2035 <br />Memorial Park Consolidation <br />Sewers and Controls <br />Large diameter sewers to collect and convey overflow <br />from CSO Basins 031, 033, 035, 036, 037 to Memorial <br />Park RTB; Segment from CSO 037 to tank increased to 78" <br />diameter (2625 lf). <br />04/2030 12/2035 <br />Regulator Modifications for <br />Memorial Park Consolidation <br />Sewer <br />Modifications to regulators for CSO 031, 033, 035, 036, <br />037, 060 <br />04/2030 12/2035