My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Beck’s Lake LaSalle Park EPA Master Plan Proj No. 120-053 - HRP Construction Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Award Bids
>
Award Bid - Beck’s Lake LaSalle Park EPA Master Plan Proj No. 120-053 - HRP Construction Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2022 2:25:43 PM
Creation date
6/14/2022 2:25:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/14/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br /> <br /> <br />TO: Theresa Heffner, Clerk, Board of Public Works <br />FROM: Finn Cavanaugh, Project Engineer, Division of Engineering <br />SUBJECT: Award Memo 122-053 Beck’s Lake LaSalle Park EPA Master Plan <br />DATE: June 3, 2022 <br />On May 24, 2022, the Board of Public Works opened and read bids for the above project. <br /> <br />The bidders ranked as follows: <br /> <br />Bidder Total Base Bid Amount <br />1. HRP Construction Inc. $2,198,945.00 <br />2. Green Demolition Contractors Inc. $3,373,315.00 <br />3. Indiana Earth Inc. $5,494,604.30 <br /> <br />Engineering found a minor calculation error in line 5 of Indiana Earth’s bid. The submitted line 5 <br />total read $144,849.15, whereas the given unit price applied to the correct quantity should have <br />read $144,879.45. There was also an -$0.10 addition error in Indiana Earth’s bid total. These <br />calculation errors are corrected in the submitted bid tab and result in a total change in bid amount of <br />+$30.40. This correction has no effect on the low bidder or placement of bids. <br /> <br />A deductive alternate to the project was included in the bid with the ability to remove all tree-related <br />work from the project. Engineering recommends rejection of this alternate, and award of the base <br />bid only. <br /> <br />All bidders were found responsive and responsible. Engineering recommends award of the Base <br />Bid to the lowest responsive and responsible bidder, HRP Construction Inc, in the amount of <br />$2,198,945.00. Engineering recommends rejecting all other bids. <br /> <br />The Department of Public Works is requesting the Board approve this award subject to the <br />appropriation of funds on June 27th by the Legal Department. Funds are sourced from the Liability <br />Insurance Fund (Fund #226-04-405-412-436000--PROJ00000226) (Requisition #PR-00015473). <br /> <br />Please respond with any questions. <br /> <br />Enclosure <br />Bid Tabulation <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.