My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Northwest Elevated Storage Tank Improvements Proj No. 122-018 - Viking Painting, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Bids
>
Opening of Bids - Northwest Elevated Storage Tank Improvements Proj No. 122-018 - Viking Painting, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2022 2:21:50 PM
Creation date
6/14/2022 2:20:59 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/14/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 4/2/2019 <br /> <br /> <br />PROJECT NAME: NORTHWEST ELEVATED STORAGE TANK REHABILITATION PROJECT <br />ADDENDUM NO. 1 <br /> <br />Date: June 8, 2022 <br /> <br />To: All Plan Holders <br /> <br />From: Theresa Heffner, Clerk of the Board of Public Works <br /> <br />This addendum and associated attachments are part of the bidding documents and modify <br />the original bidding documents. Acknowledge receipt of this addendum in the space <br />provided. <br /> <br />Item #1: Information – Pre-Bid Meeting Minutes <br /> <br />A copy of the minutes from the May 10, 2022 Pre-Bid Meeting is attached herein. <br />These minutes are for informational purposes only and do not alter the Bidding <br />Documents. <br /> <br />Item #2: General Clarifications – Question and Answer <br /> <br />Question: Do the existing interior and/or exterior coatings contain lead and if so, <br />how much? <br />Answer: Neither the existing interior nor existing exterior coatings contain lead. The <br />elevated storage tank was constructed in 2002 and coatings consisted of Sherwin- <br />Williams products including: Macropoxy 646, Corothane, and Hi-Solids Catalyzed <br />Epoxy coatings according to the project specifications. <br /> <br />Question: When is the desired mobilization date? <br />Answer: Contract time will start no later than September 15, 2022, as stated in Special <br />Provision XIII B.1 of the Contract Documents. <br /> <br />Question: What is the estimated bid price? <br />Answer: The City of South Bend does not provide estimates during the public <br />solicitation process, an engineer’s estimate will be included with the bid tab and all other <br />public documentation published at the award of the contract. <br /> <br />Question: Can we get a list of the plan holders? <br />Answer: The City of South Bend publishes on ARC PlanRoom at www.e- <br />arc.com/location/south.bend/. When the project is selected, there is an option in the top right <br />corner of the website labeled, “Planholders List.” Lastly, click on “View Report” to see the <br />plan holders. <br />
The URL can be used to link to this page
Your browser does not support the video tag.