Laserfiche WebLink
15.5 <br />WALKABLE CEILING <br />20'-4" <br />PLATFORM ACCESS <br />BY TRUCK PLATFORM <br />SUPPLIER <br />STEEL JOISTS -SEE <br />STRUCTURAL DRAWIINGS <br />STEEL BEAM -SEE <br />STRUCTURAL DRAWIINGS <br />MEMBRANE ROOF ON <br />6" RIGID INSULATION AND <br />METAL DECK <br />TILT-UP CONCRETE WALL <br />PANEL <br />INSULATED METAL PANEL <br />WALKABLE CEILING <br />SB-A207 <br />5 <br />MECHANICAL <br />148 <br />141A20'-0"142A <br />MEMBRANE ROOF ON 6" <br />RIGID INSULATION <br />METAL DECK -SEE <br />STRUCTURAL DRAWINGS <br />STEEL JOISTS -SEE <br />STRUCTURAL DRAWINGS <br />STEEL BEAM -SEE <br />STRUCTURAL DRAWINGS <br />PREFINISHED METAL <br />COPING -BEYOND <br />MEMBRANE FLASHING <br />CONCRETE TILT-UP <br />WALL PANEL <br />PREFINISHED METAL <br />GUTTER <br />MEMBRANE ROOF ON 6" <br />RIGID INSULATION <br />METAL DECK -SEE <br />STRUCTURAL DRAWINGS <br />STEEL JOISTS -SEE <br />STRUCTURAL DRAWINGS <br />STEEL BEAM -SEE <br />STRUCTURAL DRAWINGS <br />STEEL PIPE RACK -SEE <br />STRUCTURAL DRAWINGS <br />WALKABLE CEILING <br />E.8E.8 <br />METAL GIRT -SEE STRUCTURAL <br />DRAWINGS <br />METAL GIRT -SEE STRUCTURAL <br />DRAWINGS <br />MEMBRANE FLASHING - <br />EXTEND UP UNDER <br />IMP PANELS -COORDINATE <br />WITH MEMBRANE ROOF <br />MANUFACTURER <br />BASE FLASHING -COORDINATE <br />WITH IMP SUPPLIER <br />MEMBRANE ROOF ON RIGID <br />INSULATION -MECHANICALLY <br />FASTENED <br />BUILT-UP INSULATION TO ACHIEVE <br />POSITIVE DRAINAGE <br />4"1'-2" <br />METAL DECK -SEE <br />STRUCTURAL DRAWINGS <br />STEEL BEAM -SEE <br />STRUCTURAL DRAWINGS <br />STEEL COLUMN-SEE <br />STRUCTURAL DRAWINGS <br />STEEL BRACING -SEE <br />STRUCTURAL DRAWINGS <br />METAL DECK -SEE <br />STRUCTURAL DRAWINGS <br />WALKABLE CEILING - <br />BEYOND <br />3 5/8" METAL STUDS AT <br />16" O.C. <br />5/8" DENS GLASS SHEATHING <br />2" RIGID INSULATION ATTACH <br />TO SHEATHING <br />2" INSULATED METAL WALL <br />PANELS <br />PREFINISHED METAL FASCIA <br />METAL DECK -SEE <br />STRUCTURAL DRAWINGS <br />BOOT FLASHING AROUND <br />COLUMN PENETRATION - <br />TYPICAL <br />COOLING TOWER STEEL <br />SEE STRUCTURAL DRAWINGS <br />PROJECT NUMBER: <br />jedson.com <br />One Centennial Plaza <br />705 Central Ave <br />Cincinnati, OH 45202 <br />P: 513.965.5999 <br />F: 513.965.5998 <br />THIS DRAWING AND ITS RELATED COPYRIGHTS, INTELLECTUAL PROPERTY RIGHTS AND TRADE SECRETS ARE THE PROPERTY OF JEDSON <br />ENGINEERING, INC. AND CONTAINS CONFIDENTIAL INFORMATION, WHICH SHALL NOT BE USED, COPIED OR DISCLOSED WITHOUT WRITTEN PERMISSION <br />OF JEDSON ENGINEERING, INC. ©2013 JEDSON ENGINEERING, INC. ALL RIGHTS RESERVED. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />ABCDEFGHKLM <br />REVISIONS <br />ABCDEFGHJKLM <br />PROJ. NO.: <br />DRAWN BY: <br />CHECKED BY: <br />APPROVED BY: <br />SCALE:11/4/2021 1:10:22 PMApprover <br />Checker <br />Designer <br />200199 <br />McCORMICK & COMPANY <br />SECTIONS / DETAILSSB-A206SB-A206 -C <br />200199 <br />1/2" = 1'-0"1 SECTION THRU TANK FILLING -Callout 1 <br />3425 LATHROP ST. SOUTH BEND, INDIANA 46628 <br />1/2" = 1'-0"2 SECTION THRU MAKING 1 -1 <br />1 1/2" = 1'-0"3 DETAIL AT LOW ROOF <br />NO DESCRIPTION DATE DB CB AB <br />A LAYOUT PROGRESS 8/11/2021 DLR DLR <br />B LAYOUT G 8/25/2021 DLR DLR <br />C ISSUED FOR REVIEW 11/01/2021 DLR DLR