25 <br />APPENDIX "C" <br />SCHEDULE: <br />No work under this Contract shall be performed by the CONSULTANT until the CONSULTANT <br />receives a written notice to proceed from the LPA. <br />All work by the CONSULTANT under this Contract shall be completed and delivered to the LPA for <br />review and approval within the approximate time periods shown in the following submission schedule: <br />A.Assessment Report will be complete within 90 calendar days after receipt of notice to proceed <br />(NTP) from the OWNER. <br />B.Field Survey complete within 90 calendar days after the completion of the approved Assessment <br />Report by the OWNER. <br />C.Stage 1 / Preliminary Design Plans within 90 calendar days after completion of the Field Survey. <br />D.Public Information Meeting within 21 calendar days of the Stage 1 Plan Submission (If needed) <br />E.Preliminary Field Check Meeting within 28 calendar days of Owner’s Approval of the Preliminary <br />Design Plans. <br />F.NEPA Document within 450 calendar days after the approved Assessment Report by the OWNER. <br />G.Stage 3 Plans 152 days prior to the Ready for Contracts date. <br />H.Final Tracings 30 days prior to the Ready for Contracts date. <br />The anticipated Letting Date for this project is July 10, 2024 with a Ready for Contracts Date of May 1, <br />2024.