Laserfiche WebLink
Version 6-8-2017 <br />38 <br />52.Preparation of a proprietary materials request for the proposed signal upgrades.* <br />53.Preparation and submission of the Construction Stormwater General Permit.* <br />54.Bid and Construction Phase Office Services. <br />55.Preparation and/or submission of Roadway Design Plans to Stage 3 and Final Tracings <br />Submission.* <br />56.Preparation and/or submission of Water Main Design Plans to Stage 3 and Final Tracings <br />Submission.* <br />57.Preparation and/or submission of Signal Design Plans to Stage 3 and Final Tracings Submission.* <br />* Services essential to the final completion of the project and required for INDOT Letting. <br />[Remainder of Page Intentionally Left Blank]