Laserfiche WebLink
Version 6-8-2017 <br />37 <br />19.Design of slope stabilization. <br />20.Traffic signal warrants. <br />21.Lighting Design and Plans. <br />22.Performing an Existing Storm Sewer Analysis, including cleaning, and evaluating the condition of <br />the existing storm sewer pipes. <br />23.Design of a storm sewer outfall. <br />24.Providing the services of a relocation agent or relocation coordination. <br />25.Right of Way Condemnation Services. <br />26.Interconnect Design. <br />27.Preparation of as-built plans. <br />28.Survey and design of each lead service line replacement, from the right-of-way to the water meter <br />29.An integrated water quality approach for the community outreach <br />30.Comprehensive Wetland Delineation per the Corps of Engineers Manual, if required by the Corps. <br />31.Necessary permit forms and permit processing (US Army Corps of Engineers, US Coast Guard, <br />and/or Indiana Department of Natural Resources). <br />32.Wetland Permitting. <br />33.Wetland Mitigation Design Plans. <br />34.Annual mitigation monitoring, if required as a permit condition. <br />35.Floristic Quality Assessment. <br />36.Threatened and Endangered Species Surveys. <br />37.Other site investigations that may be required as a permit condition. <br />38.Preparation of an Environmental Assessment or Environmental Impact Statement. <br />39.QHEI or HHEI stream assessments. <br />40.Biological Assessment and consultation under Section 7 of the Endangered Species Act. <br />41.Aquatic or macroinvertebrate survey. <br />42.Archaeological investigation. <br />43.Preparation of a Level 3 - 4 CE. <br />44.Additional Specialized environmental compliance and/or assessment services including, but not <br />limited to: individual or programmatic Section 4(f) evaluations for involvement public parks, <br />recreational areas, wildlife, and waterfowl refuges, and/or historic sites; Section 6(f) Evaluation; <br />Initial Site Assessment or Preliminary Site Investigation for hazardous substances and/or <br />contamination; Air Quality analyses; Sole Source Aquifer groundwater assessment. <br />45.Preparation and coordination for any agreements between the City of South Bend Board of Public <br />Works and SBIA or FAA for this project. <br />46.Existing Sewer System Evaluation and Televising. <br />47.IDEM Water Main Construction Permit.* <br />48.Sanitary Sewer Design. <br />49.IDEM Sanitary Sewer Construction Permit.* <br />50.Routine Wetland Delineation. <br />51.Signal Timing Optimization.