Laserfiche WebLink
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: _______________ Project Name: __________________________ Change Order #: ____ <br />DATE INITIATED: BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Attachments: (List documents support change – required) <br />Amount of ☐Increase / ☐Decrease: $____________________ Categories (Pick One): <br />☐Scope of Work <br />☐Differing Site Conditions, Changed Conditions <br />☐Conflicted Specifications and Drawings <br />☐Failed Materials <br />☐Error <br />☐Omission <br />☐Final Quantity Adjustment <br />☐_______________________ <br />Previously approved Change Order(s): $___________________ <br />Current Percent of Change: ____________________ % <br />New Total Amount: $____________________ <br />Total Percent of Change: ____________________ % <br />Funding Secured From: __________________________ <br />(filled out by PM) <br />RECOMMENDED BY: <br />Project Inspector (Print Name) (Signature) (Date) <br />REVIEWED BY: <br />Construction Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Engineering Project Manager (Print Name) (Signature) (Date) <br />1.Additional sidewalk replacement at Walker Field: + $34,193.75 (+7.64%) <br />a.VPA requested and agreed to provide funding for this additional sidewalk. <br />2.Deduct from base bid due to quantity underruns: - $27,572.69 (-6.16%) <br />a. This deduct should revert to Engineering/Public Works funds. <br />Net change: + $6,621.06 <br />Finn Cavanaugh 02/07/2022 <br />PO-0010116 <br />02/22/2022