My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Safe Routes to School - Our Lady of Hungary Neighborhood Proj No. 122-007 - HWC Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Proposal - Safe Routes to School - Our Lady of Hungary Neighborhood Proj No. 122-007 - HWC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2022 2:28:07 PM
Creation date
3/8/2022 2:27:52 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/8/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend: PE Services for Safe Routes to School – Our Lady of Hungary Neighborhood Sidewalks and ADA Ramps (DES# 2100025) | Page 11 <br />TEAM PROJECT APPROACH RELEVANT EXPERIENCERELEVANT EXPERIENCE <br />The Market Street Streetscape has become a <br />prominent public space in downtown New Albany. <br />Originally conceived as a streetscape project, the <br />existing extra-wide sidewalk allowed for a mini-plaza <br />space to develop between the existing parking row <br />and historic buildings. Infrastructure work included <br />new sidewalks, curbs, pavement, drainage, and <br />landscaping. Custom features included decorative <br />crosswalks, a landscaped median with District archway <br />feature, limestone pier light poles with black metal <br />logos, catenary lighting, and a lit photographic map <br />identity piece. Contemporary site furnishings, bright <br />blue lounge chairs, and linear wood picnic tables were <br />placed within the crushed limestone plaza space to <br />invite and encourage visitors and residents to linger <br />while enjoying the surrounding downtown happenings <br />and many recently restored historic facades. <br />HWC provided design and inspection services for this <br />project. Work was completed in the fall of 2019. <br />MARKET STREET STREETSCAPE <br />NEW ALBANY, IN <br />HWC replaced all sidewalks and curb and gutter <br />in this downtown District of Aurora, Indiana. This <br />project included minor drainage improvements, as <br />well as the installation of pavement markings, new <br />signage, and decorative crosswalks using pavers. <br />ADA compliant curb ramps were also constructed <br />and the pavement received a preventative <br />maintenance mill and overlay of 1.5”. Coordination <br />with business owners was critical as sidewalk was <br />removed and replaced and as milling and paving <br />operations ensued. HWC not only designed the <br />project but developed the bidding documents <br />and conducted construction observation and <br />administration. The project was completed at the <br />end of 2018. <br />2ND STREET REHABILITATION <br />AURORA, IN <br />HWC provided both crack sealing and a PM 1.5” <br />mill and overlay in different sections of this Main <br />Street Rehabilitation project. HWC also met with the <br />Town and contractor to identify specific areas that <br />required full depth patching. <br />Project improvements included: <br />• Reconstruction of curb and gutter and sidewalks <br />• Providing ADA curb ramps <br />• Minor drainage improvements to the storm <br />sewer system <br />• Reworking of sidewalks and curb ramps in front <br />of the Town Hall to improve pedestrian and ADA <br />access <br />This project required design, bidding services, <br />construction observation, and administration. <br />Throughout the project, HWC kept the Town informed <br />on the construction status and involved them when <br />necessary to respond to the contractor’s questions <br />and concerns. The project was completed at the end <br />of 2018. <br />MAIN STREET REHABILITATION <br />MOORES HILL, IN <br />THANK YOU TO SOUTH BEND FOR THE OPPORTUNITY TO SUBMIT ON THIS LOI AND FOR YOUR CONSIDERATION!
The URL can be used to link to this page
Your browser does not support the video tag.