Laserfiche WebLink
City of South Bend: PE Services for Safe Routes to School – Our Lady of Hungary Neighborhood Sidewalks and ADA Ramps (DES# 2100025) | Page 10 <br />TEAM PROJECT APPROACH RELEVANT EXPERIENCERELEVANT EXPERIENCE <br />HWC worked with the City of Salem to provide survey, design, permitting, and <br />construction administration services for the Market Street Rehabilitation project. <br />Pavement width was decreased to provide two 12’ travel lanes, two 8’ parking <br />lanes, 7’ sodded buffers behind the curb, and 5’ sidewalks. The project improved <br />drainage issues and pedestrian/ADA safety. <br />Project improvements included: <br />The $655,000 project was funded through the Community Crossings Matching Grant <br />Program. Construction began in June of 2018. The section west of Brock Creek was <br />completed in October of 2018, while the section east of Brock Creek was completed <br />in August of 2019. <br />MARKET STREET REHABILITATION <br />SALEM, IN <br />HWC provided design, bidding, and will provide construction inspection services <br />for the Safe Routes to School project in Brookville, Indiana. The project was <br />located along Fairfield Avenue, SR 101, and Oxford Pike. <br />All three road segments are either missing sidewalk, have sidewalk that needs <br />to be rehabilitated, needs compliant curb ramps, or a combination of all three. <br />HWC designed new sidewalk and a safe pedestrian crossings along Fairfield <br />Avenue. Along SR 101, approximately 40’ of sidewalk that has deteriorated will <br />be replaced. On Oxford Pike, a new sidewalk was designed to safely convey <br />pedestrian foot traffic. All non compliant ramps will be removed and replaced <br />with ADA compliant curb ramps. <br />The project also includes the installation of new curbs, drainage structures, and <br />pipes along Oxford Pike from SR 101 to Whitewater Drive. <br />The project was successfully bid, awarded, and is moving to construction this <br />year. Estimated construction cost was $490,000 the and awarded bid was under <br />this amount. <br />BROOKVILLE SAFE ROUTES TO SCHOOLBROOKVILLE, IN <br />• A mill and overlay roadway <br />• A new storm drainage collection <br />system <br />• New sidewalks, bump outs, and ADA <br />ramps <br />• Installation of new curbs and gutters <br />• New signage and pavement <br />markings <br />• A sodded buffer strip <br />PRE <br />CONSTRUCTION <br />PHOTO