My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Randolph Park Area Improvements Proj No. 120-049 - Rieth-Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Bids
>
Opening of Bids - Randolph Park Area Improvements Proj No. 120-049 - Rieth-Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2022 2:26:59 PM
Creation date
3/8/2022 2:25:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/8/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. The Contractor shall be responsible for erosion control measures and keeping the <br />sedimentation on site. Measures include but are not limited to installing silt fence where <br />the ground slopes away from the project site, installing inlet protection as necessary to <br />keep sediment out of inlets during construction, installing gravel pads, installing concrete <br />washout or other necessary measures to prevent tracking sediment offsite. <br />5. The contractor shall vegetate all areas that lay bare for more than fourteen (14) days with <br />temporary seeding. The contractor shall inspect all erosion control measures a minimum <br />of once per week, and within 24 hours after every rainfall event of Y2" or more. The <br />Contractor shall take corrective measures as necessary and maintain all temporary erosion <br />control measures. <br />6. The cost of Temporary Erosion Control shall include the removal and disposal of sediment, <br />as directed by the project representative. <br />7. Measure and Payment <br />a. Payment for all costs for temporary erosion control including erosion control fabric <br />material, seed and installation, shall be paid for as a onetime lump sum cost for all <br />parts at the contract unit price under the pay item: <br />TEMPORARY EROSION CONTROL.........................................................LSUM <br />XXXVIII. UTILITY ALLOWANCE <br />A. Prevailing Specifications: None <br />B. Additions: <br />1. Existing water mains and gas lines cross the proposed storm sewer alignment and may <br />occur at a depth that creates a conflict. The contractor shall field verify these existing utility <br />depths and do not interfere with the proposed alignment, and if so the allowance shall be <br />used to coordinate with the proper utility company to adjust the water or gas lines. <br />2. Measurement and Payment <br />a. Payment for all costs associated with the possible adjustment and all appurtenances <br />of the existing gas and/or water main for a complete installation of the proposed sewer <br />shall be paid as an allowance. <br />UTILITY ALLOWANCE............................................................ALLOWANCE <br />XXXIX. M/WBE GOALS <br />A. Prevailing Specifications: City of South Bend Ordinance No. 10761-21, Minority and Women <br />Business Enterprise Inclusion Program Plan <br />B. Additions: <br />1. The M/WBE Goals for this Project are <br />a. MBE 4.7 %. <br />b. WBE 2.4 %. <br />2. Complete FORMS MBE -1.0 MBE Utilization Plan and WBE-1.0 WBE Utilization Plan, and <br />submit with Bid Proposal <br />Version 08/25/2021 Special Provisions -17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.