Laserfiche WebLink
Manhour Fee Justification <br />Client:City of South Bend <br />Project Name:Jackson Rd. Improvements <br />Project No.:22-1089 <br />Manhour Justification <br />Principle / Sr Proj MgrSr. Proj Engr / PM/ Sr. ConsultantSr Engr / Sr Dsgr / Sr Surv.Engr / Dsgr / SurvSr Tech /Sr ObservTechnician / ObservorAdmin2 Man Survey Crew1 Man Survey Crew Task Description Totals Total Fee <br />Task 2 100 % Design Submission 0 68 120 200 0 0 0 0 0 388 43,300$ <br />20 Final Title Sheet/obtain signatures of PWD 2 4 650$ <br />21 Finalize Index Sheet with Pertinent Utility Information 4 8 1,300$ <br />22 Typical Cross Sections 12 24 3,900$ <br />23 Finalize MOT/Pedestrian plans with Signage and note 16 48 6,880$ <br />24 Final Plan and Profile on Aerial Mapping showing exist./prop. elev's <br />for ramps and pavement, show flow arrows to nearby inlets 16 40 6,040$ <br />25 Fnal details of curb ramps -$ <br />26 Final Erosion Control Plans 8 16 2,600$ <br />27 Final Pavement Marking and Signage Plan 8 8 1,760$ <br />28 Final Miscellaneous details, driveway replacement table, structure <br />replacement table/ incidental work.2 6 12 2,200$ <br />29 NO CROSS_SECTIONS -$ <br />30 Final Quantity Calcs and Cost Estimates 2 6 8 1,780$ <br />31 Permit Application- Rule 5 8 16 2,600$ <br />32 Finalize Specifications 6 12 2,130$ <br />33 Site Visit 8 1,000$ <br />34 Project Management 12 1,500$ <br />35 Final Utility Coordination (Conflict Analysis, Workplan, Approvals)12 8 2,420$ <br />36 QA/QC time 16 2,000$ <br />37 Mtg with City review / 1 visit PM/Designer visit 6 6 1,440$ <br />38 Compliance with City at 100% Review 4 8 16 3,100$ <br />-$ <br />Task 3 Unasssigned 0 0 0 0 0 0 0 0 0 0 -$ <br />-$ <br />-$ <br />-$ <br />-$ <br />Task 4 Unassigned 0 0 0 0 0 0 0 0 0 0 -$ <br />-$ <br />-$ <br />Revised 22-1089 South Bend 2022 Road Rehab - Jackson St. Fee NT.xlsx 4 of 6