Laserfiche WebLink
Manhour Fee Justification <br />Client:City of South Bend <br />Project Name:Jackson Rd. Improvements <br />Project No.:22-1089 <br />Manhour Justification <br />Principle / Sr Proj MgrSr. Proj Engr / PM/ Sr. ConsultantSr Engr / Sr Dsgr / Sr Surv.Engr / Dsgr / SurvSr Tech /Sr ObservTechnician / ObservorAdmin2 Man Survey Crew1 Man Survey Crew Task Description Totals Total Fee <br />Task 1 30%-50% Design Submission 16 44 116 148 0 0 0 0 0 324 37,100$ <br />1 Title Sheet 2 2 440$ <br />2 Index Sheet 2 2 440$ <br />3 Preliminary Typical Cross Sections 6 12 1,950$ <br />4 Preliminary MOT/Pedestrian plans with Signage and note 12 24 3,900$ <br />5 Plan and Profile on Aerial Mapping showing exist./prop. elev's for <br />ramps and pavement, show flow arrows to nearby inlets 12 40 5,580$ <br />6 Configuration of curb ramps -$ <br />7 Preliminary Erosion Control Plans 4 12 1,720$ <br />8 Preliminary Pavement Marking and Signage Plan 8 16 2,600$ <br />9 Miscellaneous details, driveway replacement table, structure <br />replacement table/ incidental work.6 12 1,950$ <br />10 NO CROSS_SECTIONS -$ <br />11 Preliminary Quantity Calcs and Cost Estimates 4 8 1,420$ <br />12 Preliminary Permit Application- Rule 5 8 12 2,180$ <br />13 Preliminary Unique Special Provisions 8 8 1,920$ <br />14 Site Visit 8 8 1,920$ <br />15 Project Management 12 1,500$ <br />16 Initiate Utility Coordination (Design Inquiry and Verification)16 1,840$ <br />17 QA/QC time 16 2,720$ <br />18 Mtg with City review / 1 visit PM/Designer visit 8 8 1,920$ <br />19 Compliance with City at 50% Review 4 8 16 3,100$ <br />-$ <br />Revised 22-1089 South Bend 2022 Road Rehab - Jackson St. Fee NT.xlsx 3 of 6