Laserfiche WebLink
PROJECT:SOUTH BEND 2022 ROAD REHAB Created By:LSG Checked by: <br />STREET:HIIL STREET (JEFFERSON BLVD TO COLFAX AVE)Date:12/17/2021 Date Checked: <br />MATERIAL:ASPHALT PAVEMENT <br />QUANTITY UNIT UNIT COST ITEM COST <br />1 CONSTRUCTION ENGINEERING (2%)1.00 LS $6,100.00 $6,100.00 <br />2 MOBILIZATION AND DEMOBILIZATION (5%)1.00 LS $15,300.00 $15,300.00 <br />3 CLEARING RIGHT OF WAY (1%)1.00 LS $3,100.00 $3,100.00 <br />4 SUBGRADE TREATMENT,TYPE II 3880.00 SYS $11.00 $42,680.00 <br />5 SUBBASE NO. 53 1189.00 TON $22.00 $26,158.00 <br />6 HMA SURFACE, TYPE B 295.00 TON $75.00 $22,125.00 <br />7 HMA INTERMEDIATE, TYPE B 491.00 TON $70.00 $34,370.00 <br />8 HMA BASE, TYPE B 1570.00 TON $65.00 $102,050.00 <br />9 SIDEWALK, CONCRETE 309.00 SYS $60.00 $18,540.00 <br />10 STANDARD CURB 1582.00 LFT $18.00 $28,476.00 <br />11 PCCP FOR APPROACHES, 6 IN 312.00 SYS $67.00 $20,904.00 <br />12 MULCHED SEEDING U 356.00 SYS $2.00 $712.00 <br />13 TOPSOIL 20.00 CYS $80.00 $1,600.00 <br />14 CASTING, FURNISH & ADJUST TO GRADE 6.00 EACH $1,250.00 $7,500.00 <br />15 MAINTAINING TRAFFIC (3%)1.00 LS $9,200.00 $9,200.00 <br />CONTINGENCY (20%)1.00 LS $61,000.00 $61,000.00 <br />Total Cost Estimate $399,815.00 <br />DESCRIPTIONItem No. <br />PROBABLE CONSTRUCTION COST ESTIMATE