PROJECT:SOUTH BEND 2022 ROAD REHAB Created By:LSG Checked by: <br />STREET:JACKSON ROAD (FELLOWS ST TO MIAMI ST)Date:12/16/2021 Date Checked: <br />MATERIAL:ASPHALT PAVEMENT <br />QUANTITY UNIT UNIT COST ITEM COST <br />1 CONSTRUCTION ENGINEERING (2%)1.00 LS $14,600.00 $14,600.00 <br />2 MOBILIZATION AND DEMOBILIZATION (5%)1.00 LS $36,500.00 $36,500.00 <br />3 CLEARING RIGHT OF WAY (1%)1.00 LS $7,300.00 $7,300.00 <br />4 SUBGRADE TREATMENT,TYPE II 10377.00 SYS $11.00 $114,147.00 <br />5 STRUCTRUAL BACKFILL, TYPE 2 196.00 CYS $53.00 $10,388.00 <br />6 SUBBASE NO. 53 3339.00 TON $22.00 $73,458.00 <br />7 HMA SURFACE, TYPE B 801.00 TON $75.00 $60,075.00 <br />8 HMA INTERMEDIATE, TYPE B 1334.00 TON $70.00 $93,380.00 <br />9 HMA BASE, TYPE B 4267.00 TON $65.00 $277,355.00 <br />10 STANDARD CURB 116.00 LFT $18.00 $2,088.00 <br />11 COMBINATION CURB & GUTTER, TYPE B 408.00 LFT $28.00 $11,424.00 <br />12 COMBINATION CURB & GUTTER, TYPE A 563.00 LFT $30.00 $16,890.00 <br />13 PCCP FOR APPROACHES, 6 IN 356.00 SYS $67.00 $23,852.00 <br />14 MULCHED SEEDING U 1333.00 SYS $2.00 $2,666.00 <br />15 TOPSOIL 74.00 CYS $80.00 $5,920.00 <br />16 PIPE, TYPE 2, CIRCULAR, 12"661.00 LFT $58.00 $38,338.00 <br />17 MAINTAINING TRAFFIC (3%)1.00 LS $21,900.00 $21,900.00 <br />CONTINGENCY (20%)1.00 LS $146,000.00 $146,000.00 <br />Total Cost Estimate $956,281.00 <br />DESCRIPTIONItem No. <br />PROBABLE CONSTRUCTION COST ESTIMATE