My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Safe Routes to School - Muessel Primary and Holy Cross Area Proj No. 122-006 - SJCA Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Proposal - Safe Routes to School - Muessel Primary and Holy Cross Area Proj No. 122-006 - SJCA Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 4:20:05 PM
Creation date
2/22/2022 4:19:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 SJCA | City of South Bend | Safe Routes to School | DES 1900447 <br />Authorized Negotiator <br />SHERLY GEORGE, PE <br />Sherly has over 27 years of <br />experience in management and <br />design of a variety of bridge and <br />roadway projects. Serving as QA/ <br />QC, she will review all design plans. <br />TEAM LEADERSHIP <br />Roadway Design <br />MITCH PRATT, PE <br />Mitch has 6 years of experience <br />with roadway design with roadway <br />reconstruction, sidewalks, curb ramps, <br />signing, and pavement markings, His <br />experience includes generating plan <br />sets made up of cover sheets, location <br />maps, typical sections, alignments, <br />and construction details. <br />QA/QC <br />HARRY FOX, PE <br />Harry’s experience exceeds 35 <br />years of transportation design & <br />construction projects, including 25 <br />years in design management and 10 <br />years in on-site construction. <br />Survey <br />CHARLIE THOMAS, PS <br />Charlie is the Director of Survey <br />Services responsible for all <br />surveying services performed <br />by the firm. He has 28 years of <br />experience that includes technical <br />and management responsibilities <br />for topographic route surveys, <br />construction staking and boundary <br />surveys. <br />Right-of-Way <br />SETH DYER, PS <br />Seth has over 10 years of experience <br />that includes technical and <br />management responsibilities for <br />right of way engineering. He leads <br />the department in providing clients <br />with excellent, on-time services. <br />Environmental Services <br />NADEEM SADDIKI, PE <br />Nadeem has over 30 years <br />of experience conducting <br />Environmental Site Assessments <br />and preparation of NEPA <br />Documents. He serves as the Lead <br />for NS Services for compliance with <br />the National Environmental Policy <br />Act (NEPA) on federal and state <br />funded projects.
The URL can be used to link to this page
Your browser does not support the video tag.