My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Bendix Improvements, Phase II - Lathrop to Voorde Proj No. 121-047 - Kapur Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Proposal - Bendix Improvements, Phase II - Lathrop to Voorde Proj No. 121-047 - Kapur Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 4:19:27 PM
Creation date
2/22/2022 4:19:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DES: 2100022 | City of South Bend - LaPorte District - PE/RW Services for Bendix Drive | 11 <br />SIMILAR EXPERIENCE <br />RIGHT-OF-WAY ACQUISITION PROJECTS <br />Dawn Replogle of Etica Group has recently completed the following projects for INDOT: <br />SR 55 Road Reconstruction in Warren County, INDOT <br />SR 26 HMA Resurfacing in Jay County, INDOT <br />I-69 Section 4 New Construction, INDOT <br />I-465 Northeast Corridor Reconstruction, INDOT <br />PROJECTS COMPLETED UNDER SHAKEEL BAIG (ADDITIONAL) <br />Route Work Type Location <br />SP BIKE Bike/pedestrian facilities Calumet Trail Rehab from Mineral Springs Road to SR 49 <br />SP BIKE Bike/pedestrian facilities Westchester - Liberty Trail, Phase II <br />IR 1025 Bike/pedestrian facilities Oak Savannah Trail: Oak Ridge Prairie to Erie Lackawanna Trail <br />IR 1025 Bike/pedestrian facilities Jacques Marquette Elementary School Sidewalks <br />PR NONE Bike/pedestrian facilities Greenways Trail between Jefferson and Garro Street near the <br />Yellow River <br />ST 1001 Construct ADA approved sidewalk ramps North side of town near the elementary school <br />IR 1025 Bike/pedestrian facilities Erie Lackawanna Trail, Calumet Avenue Bridge <br />ST 1000 Intersection improvement 45th Avenue from Colfax to Whitcomb (earmark) (Phase III) <br />IR 1012 Road reconstruction (3R/4R standards)CR400S Phase III (SR 25 to SR 29) - 1.10 miles; beginning ~1.55 <br />miles east SR 25 <br />ST 1001 Bike/pedestrian facilities University Park (SR 53) Crosswalk Improvements between <br />33rd Avenue to 35th Avenue <br />US 41 Auxiliary Lanes, two-way, left turn lanes From US 231 to 1.99 miles north of US 231 (93rd Avenue) <br />IR 1023 Bike/pedestrian facilities Marquette Greenway/Singing Sands Connector Trail East <br />ST 1001 Road reconstruction (3R/4R standards)Ridge Road Reconstruction, Connecticut Street to <br />Mississippi Street Phase II <br />IR 1001 Road reconstruction (3R/4R standards)Samuelson Road Reconstruction; Central Avenue to <br />Portage Avenue <br />ST 1001 Road reconstruction (3R/4R standards)County Line Road - US 6 to East Cleveland Avenue <br />IR 1023 Bike/pedestrian facilities Singing Sands Trail Phase II - Franklin Street Bridge to <br />East Street <br />ST 1033 Construct ADA approved sidewalk ramps Middle school corridor sidewalks <br />SP BIKE Construct ADA approved sidewalk ramps Northview Elementary sidewalks <br />SP VARI Bike/Pedestrian Facilities Michigan City - Singing Sands Lighthouse Trail Phase I, <br />Porter County to MC <br />IR 1019 Auxiliary lanes, acceleration & deceleration <br />of turn lanes <br />Calumet Avenue from Burlington Beach Road to <br />Bullseye Lake Road <br />IR 1025 Bike/pedestrian facilities Marquette Greenway: Hammond Lake Front Park to State Line
The URL can be used to link to this page
Your browser does not support the video tag.