My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Bendix Improvements, Phase II - Lathrop to Voorde Proj No. 121-047 - Kapur Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Proposal - Bendix Improvements, Phase II - Lathrop to Voorde Proj No. 121-047 - Kapur Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 4:19:27 PM
Creation date
2/22/2022 4:19:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DES: 2100022 | City of South Bend - LaPorte District - PE/RW Services for Bendix Drive | 10 <br />CALHOUN ROAD | BROOKFIELD, WI <br />Kapur provided the design for reconstruction of 1.16 miles of <br />Calhoun Road in the City of Brookfield as a highway capacity <br />improvement project. The design included alternative <br />analysis for the reconstruction of the existing two-lane rural <br />facility to an urban four-lane facility. Alternative analysis <br />included a four-lane divided urban section and a four-lane <br />divided rural section. Major design considerations included <br />providing access to the many homes along this corridor, <br />historical impacts, signalization warrants at Wisconsin <br />Avenue, and drainage considerations. Some of the performed <br />services include creating a public involvement plan, utility <br />coordination, right-of-way plat, and traffic control planning <br />and staging. <br />CTH C | PLYMOUTH, WI <br />Kapur performed preliminary and final design for the <br />reconstruction of a four-lane urban roadway. Project <br />included alternative analysis, environmental documentation, <br />design, and right-of-way plat for the reconstruction of a <br />two-lane rural roadway to a four-lane divided roadway. <br />Project scope also included public involvement, intersection <br />analysis, traffic signal design, agency coordination, and <br />utility coordination. This project was a local program project <br />with WisDOT that involved TWLTL and four-lane undivided <br />sections in a very developed urban corridor. <br />SIMILAR EXPERIENCE <br />COUNTY LINE ROAD | WASHINGTON COUNTY, WI <br />Kapur performed preliminary and final design for the <br />reconstruction and capacity expansion of County Line <br />Road (CTH Q) from a two-lane rural roadway to a four-lane <br />divided urban facility in Washington County. Scope included <br />reconstruction with added lanes, improving intersection sight <br />distance, signalized intersection at Division Road, right-of- <br />way plat, and complete PS&E to WisDOT standards.
The URL can be used to link to this page
Your browser does not support the video tag.