Laserfiche WebLink
City of South Bend: PE/RW Services for Bendix Dr (Lathrop to Voorde) (DES# 2100022) | Page 11 <br />TEAM PROJECT APPROACH RELEVANT EXPERIENCE <br />The Market Street Streetscape has become a <br />prominent public space in downtown New Albany. <br />Originally conceived as a streetscape project, the <br />existing extra-wide sidewalk allowed for a mini-plaza <br />space to develop between the existing parking row <br />and historic buildings. Infrastructure work included <br />new sidewalks, curbs, pavement, drainage, and <br />landscaping. Custom features included decorative <br />crosswalks, a landscaped median with District archway <br />feature, limestone pier light poles with black metal <br />logos, catenary lighting, and a lit photographic map <br />identity piece. Contemporary site furnishings, bright <br />blue lounge chairs, and linear wood picnic tables were <br />placed within the crushed limestone plaza space to <br />invite and encourage visitors and residents to linger <br />while enjoying the surrounding downtown happenings <br />and many recently restored historic facades. <br />HWC provided design and inspection services for this <br />project. Work was completed in the fall of 2019. <br />MARKET STREET STREETSCAPENEW ALBANY, IN <br />HWC replaced all sidewalks and curb and gutter <br />in this downtown District of Aurora, Indiana. This <br />project included minor drainage improvements, as <br />well as the installation of pavement markings, new <br />signage, and decorative crosswalks using pavers. <br />ADA compliant curb ramps were also constructed <br />and the pavement received a preventative <br />maintenance mill and overlay of 1.5”. Coordination <br />with business owners was critical as sidewalk was <br />removed and replaced and as milling and paving <br />operations ensued. HWC not only designed the <br />project but developed the bidding documents <br />and conducted construction observation and <br />administration. The project was completed at the <br />end of 2018. <br />2ND STREET REHABILITATION <br />AURORA, IN <br />HWC provided both crack sealing and a PM 1.5” <br />mill and overlay in different sections of this Main <br />Street Rehabilitation project. HWC also met with the <br />Town and contractor to identify specific areas that <br />required full depth patching. <br />Project improvements included: <br />• Reconstruction of curb and gutter and sidewalks <br />• Providing ADA curb ramps <br />• Minor drainage improvements to the storm <br />sewer system <br />• Reworking of sidewalks and curb ramps in front <br />of the Town Hall to improve pedestrian and ADA <br />access <br />This project required design, bidding services, <br />construction observation, and administration. <br />Throughout the project, HWC kept the Town informed <br />on the construction status and involved them when <br />necessary to respond to the contractor’s questions <br />and concerns. The project was completed at the end <br />of 2018. <br />MAIN STREET REHABILITATION <br />MOORES HILL, IN <br />THANK YOU TO SOUTH BEND FOR THE OPPORTUNITY TO SUBMIT ON THIS LOI AND FOR YOUR CONSIDERATION! <br />RELEVANT EXPERIENCE