Laserfiche WebLink
City of South Bend: PE/RW Services for Bendix Dr (Lathrop to Voorde) (DES# 2100022) | Page 10 <br />TEAM PROJECT APPROACH RELEVANT EXPERIENCERELEVANT EXPERIENCE <br />HWC worked with the City of Salem to provide survey, design, permitting, and <br />construction administration services for the Market Street Rehabilitation project. <br />Pavement width was decreased to provide two 12’ travel lanes, two 8’ parking <br />lanes, 7’ sodded buffers behind the curb, and 5’ sidewalks. The project improved <br />drainage issues and pedestrian/ADA safety. <br />Project improvements included: <br />The $655,000 project was funded through the Community Crossings Matching Grant <br />Program. Construction began in June of 2018. The section west of Brock Creek was <br />completed in October of 2018, while the section east of Brock Creek was completed <br />in August of 2019. <br />MARKET STREET REHABILITATION <br />SALEM, IN <br />HWC provided design, bidding, and construction inspection services for the <br />Madison Street Resurfacing project in Muncie, Indiana. The overall project <br />stretched from 28th Street to Wysor Street (approx. 2.4 miles). <br />The project included the open cut installation of a new stormwater system at <br />a railroad overpass that ties into a previously constructed pump system near <br />Madison Street and Kirby Street. <br />The project also included replacement of existing sidewalk, ADA ramps, <br />roadway mill and resurfacing, installation of traffic striping and signal loop <br />detectors, new curb and gutter, and installation of sodding between curb and <br />sidewalks. <br />The project was broken into two phases and locally funded. The $1.5 million first <br />phase was completed in 2015 and the $700,000 second phase was completed <br />in June 2018. <br />MADISON STREET RESURFACING IMPROVEMENTSMUNCIE, IN <br />• A mill and overlay roadway <br />• A new storm drainage collection <br />system <br />• New sidewalks, bump outs, and ADA <br />ramps <br />• Installation of new curbs and gutters <br />• New signage and pavement <br />markings <br />• A sodded buffer strip