My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rejection of Quote - Studebaker Fountain Water Improvements Proj No. 121-032 - Culligan Water
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Reject Bids/Quotes/Proposals
>
Rejection of Quote - Studebaker Fountain Water Improvements Proj No. 121-032 - Culligan Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 9:40:25 AM
Creation date
2/10/2022 9:39:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/8/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 1 <br />INTER-OFFICE MEMORANDUM <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br />TO: Laura Hensley, Clerk <br />Board of Public Works <br />FROM: Sarah Beam, Project Engineer <br />SUBJECT: Reject Quotes Project No. 121-032 <br />Studebaker Fountain Water Improvements <br />DATE: February 1, 2022 <br />On January 25, 2022, the Board of Public Works opened and read quotes for the Studebaker <br />Fountain Water Improvements project. <br />One quote was received from Culligan for $16,249. Culligan’s quote included only the <br />equipment price of the water softener system and brine tanks. The quote did not include the <br />materials and labor required in the quote specifications in relation to the following tasks: <br />directional drilling and installation of sanitary lines, connection to existing utilities, installation of <br />indoor plumbing and equipment, paving, earthwork, and landscape restoration. <br />I request that the Board declare the Culligan quote as non-responsive and advance the project <br />to the open market because: <br />1)The quote fails to conform in all material respects to the specifications. <br />2)The quote fails to comply specifically with the invitation to quote and the instructions to <br />quoters. <br />The project Quote Specifications and Culligan quote are attached for reference as needed. <br />Please contact me with questions. <br />Enclosures <br />February 8, 2022
The URL can be used to link to this page
Your browser does not support the video tag.