Laserfiche WebLink
Confidential & Proprietary Information of Ameresco, Inc. <br />Page 24 of 54 <br />ATTACHMENT B <br />SCOPE OF SERVICES <br />This Attachment sets forth a description of existing equipment and the Energy Conservation Measures <br />(ECM) and related equipment to be installed by Ameresco at the buildings, facilities, and areas set forth <br />in Attachment A within the Property. Installation of the ECM(s) and the included equipment is subject <br />to change if Ameresco discovers unforeseen conditions at the Property that render its preliminary <br />analysis of the Property inaccurate, or significantly affect achievement of the Guaranteed Savings. Any <br />changes to the installation of the ECM(s) and the included equipment are subject to approval of <br />Customer and issuance of a Change Order, which approval shall not be unreasonably withheld, <br />conditioned or delayed. <br />The ECMs described below are included in the Scope of Services: <br />•ECM 1: Boiler & Pump Replacement <br />•ECM 2: AHU-1 Replacement <br />•ECM 3: RTU & MAU Replacement <br />•ECM 4: Heatpump Controls Upgrades <br />•ECM 5: New Building Automation System <br />•ECM 6: Plumbing Fixture Replacement <br />•ECM 7: Roofing Replacement <br />•ECM 8: Fire Alarm System Replacement <br />•ECM 9: LED Lighting Upgrades <br />ECM 1: Boiler & Pump Replacement <br />•Remove (3) existing boilers and associated boiler pumps <br />•Furnish and Install (3) New high efficiency condensing, natural gas fired boilers with 1200 <br />MBH input and 1138 MBH output. New boiler pumps and boilers will be installed on <br />existing housekeeping pads. (3) boilers will be installed to provide redundancy and safety in <br />case of any individual boiler going down <br />•New boiler exhaust flues will be routed up through vertical chase in boiler room. Roof <br />penetrations and rain caps provided. <br />•New boilers will be connected to the existing main hot water piping manifold <br />•New boilers will be connected to the existing main natural gas line <br />•Remove heating pumps HP‐1,2,3 and 4 and replace with new equivalent sized pumps and <br />motors with VFDs. Use existing housekeeping pads and electrical connections <br />•Remove SP‐1, WP‐1 and GP‐1 and replace with new equivalent sized pumps and motors. <br />Use existing housekeeping pads and electrical connections. <br />•New Boilers and pumps will be connected and controllable on the new BAS installed under <br />ECM 5.