My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No 35-2021 - Ameresco Inc. Qualified Provider Approval Guaranteed Energy Savings Contract Morris
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Resolutions
>
Resolution No 35-2021 - Ameresco Inc. Qualified Provider Approval Guaranteed Energy Savings Contract Morris
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 4:05:53 PM
Creation date
1/24/2022 4:05:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Confidential & Proprietary Information of Ameresco, Inc. <br />Page 24 of 54 <br />ATTACHMENT B <br />SCOPE OF SERVICES <br />This Attachment sets forth a description of existing equipment and the Energy Conservation Measures <br />(ECM) and related equipment to be installed by Ameresco at the buildings, facilities, and areas set forth <br />in Attachment A within the Property. Installation of the ECM(s) and the included equipment is subject <br />to change if Ameresco discovers unforeseen conditions at the Property that render its preliminary <br />analysis of the Property inaccurate, or significantly affect achievement of the Guaranteed Savings. Any <br />changes to the installation of the ECM(s) and the included equipment are subject to approval of <br />Customer and issuance of a Change Order, which approval shall not be unreasonably withheld, <br />conditioned or delayed. <br />The ECMs described below are included in the Scope of Services: <br />•ECM 1: Boiler & Pump Replacement <br />•ECM 2: AHU-1 Replacement <br />•ECM 3: RTU & MAU Replacement <br />•ECM 4: Heatpump Controls Upgrades <br />•ECM 5: New Building Automation System <br />•ECM 6: Plumbing Fixture Replacement <br />•ECM 7: Roofing Replacement <br />•ECM 8: Fire Alarm System Replacement <br />•ECM 9: LED Lighting Upgrades <br />ECM 1: Boiler & Pump Replacement <br />•Remove (3) existing boilers and associated boiler pumps <br />•Furnish and Install (3) New high efficiency condensing, natural gas fired boilers with 1200 <br />MBH input and 1138 MBH output. New boiler pumps and boilers will be installed on <br />existing housekeeping pads. (3) boilers will be installed to provide redundancy and safety in <br />case of any individual boiler going down <br />•New boiler exhaust flues will be routed up through vertical chase in boiler room. Roof <br />penetrations and rain caps provided. <br />•New boilers will be connected to the existing main hot water piping manifold <br />•New boilers will be connected to the existing main natural gas line <br />•Remove heating pumps HP‐1,2,3 and 4 and replace with new equivalent sized pumps and <br />motors with VFDs. Use existing housekeeping pads and electrical connections <br />•Remove SP‐1, WP‐1 and GP‐1 and replace with new equivalent sized pumps and motors. <br />Use existing housekeeping pads and electrical connections. <br />•New Boilers and pumps will be connected and controllable on the new BAS installed under <br />ECM 5.
The URL can be used to link to this page
Your browser does not support the video tag.