My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPA Consulting Contract - Const. Inspection Svcs. Coal Line Trail Phase II – Lawson-Fisher Associates P.C.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
LPA Consulting Contract - Const. Inspection Svcs. Coal Line Trail Phase II – Lawson-Fisher Associates P.C.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 3:35:49 PM
Creation date
1/11/2022 3:35:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
1/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Version 6-8-2017 <br />23 <br />APPENDIX "B" <br />INFORMATION AND SERVICES TO BE FURNISHED BY THE LPA: <br />The LPA shall furnish the CONSULTANT with the following: <br />1.Criteria for design and details for signs, signals, lighting, highway and structures such as grades, <br />curves, sight distances, clearances, design loading, etc. <br />2.Standard Specifications and standard drawings applicable to the project <br />3.Plans of existing bridge within the project limits <br />4.All written views pertinent to the location and environmental studies that are received by INDOT <br />5.Traffic assignments, Traffic Signal Warrants (New Signal), Traffic Lighting Warrants (New <br />Lighting) <br />6.Necessary permit forms and permit processing (US Army Corps of Engineers, US Coast Guard, <br />and/or Indiana Department of Natural Resources) <br />7.Available data from the transportation planning process <br />8.Utility plans available to INDOT covering utility facilities govern the location of signals and <br />underground conduits throughout the affected areas <br />9.Provide access to enter upon public and private lands as required for the CONSULTANT to <br />perform work under this Contract <br />10.Aerial Survey information <br />11.Existing water quality data <br />12.Laboratory tests for pavement investigation <br />13.Pavement design analysis <br />14.Geotechnical investigation, if applicable
The URL can be used to link to this page
Your browser does not support the video tag.