Laserfiche WebLink
BID TABULATION <br />Project Name: Riverside Drive Bank Stabilization <br />Project No: 118-005B <br />Riverside Drive Bank Stabilization <br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost <br />1 MOBILIZATION AND DEMOBILIZATION 1 LS $24,000.00 $24,000.00 $100,000.00 $100,000.00 $42,350 $42,350.00 $40,000 $40,000.00 <br />2 MAINTENANCE OF TRAFFIC 2 EACH $6,000.00 $12,000.00 $14,500.00 $29,000.00 $5,000.00 $10,000.00 $10,000.00 $20,000.00 <br />3 CONSTRUCTION ENGINEERING 1 LS $3,000.00 $3,000.00 $10,000.00 $10,000.00 $16,000.00 $16,000.00 $5,500.00 $5,500.00 <br />4 AS-BUILT DRAWING & REPORTING 1 LS $3,000.00 $3,000.00 $2,000.00 $2,000.00 $6,000.00 $6,000.00 $2,000.00 $2,000.00 <br />5 CLEARING, GRUBBING & OBSTRUCTION REMOVAL 1 LS $9,000.00 $9,000.00 $119,150.00 $119,150.00 $162,900.00 $162,900.00 $140,000.00 $140,000.00 <br />6 TREE REMOVAL, 4 to 8"1 EACH $240.00 $240.00 $400.00 $400.00 $1,600.00 $1,600.00 $400.00 $400.00 <br />7 TREE REMOVAL, Over 8 to 12"10 EACH $360.00 $3,600.00 $500.00 $5,000.00 $1,400.00 $14,000.00 $500.00 $5,000.00 <br />8 TREE REMOVAL, Over 12 to 24"13 EACH $600.00 $7,800.00 $800.00 $10,400.00 $2,000.00 $26,000.00 $800.00 $10,400.00 <br />9 TREE REMOVAL, Over 24 to 36"1 EACH $1,200.00 $1,200.00 $3,000.00 $3,000.00 $6,000.00 $6,000.00 $3,000.00 $3,000.00 <br />10 TREE REMOVAL, Over 36 to 60"1 EACH $1,500.00 $1,500.00 $5,000.00 $5,000.00 $8,000.00 $8,000.00 $5,000.00 $5,000.00 <br />11 TREE REMOVAL, Over 60"- EACH $2,400.00 $0.00 $0.00 $0.00 $10,000.00 $0.00 $7,000.00 $0.00 <br />12 EXCAVATION, UNCLASSIFIED 1,350 CYS $25.20 $34,020.00 $45.00 $60,750.00 $96.00 $129,600.00 $48.00 $64,800.00 <br />13 INDOT CLASS I RIPRAP 2,100 TON $168.00 $352,800.00 $295.00 $619,500.00 $154.00 $323,400.00 $223.00 $468,300.00 <br />14 COIR MAT (700 g)500 SYS $8.40 $4,200.00 $12.25 $6,125.00 $16.00 $8,000.00 $16.95 $8,475.00 <br />15 NAG SC150BN EROSION CONTROL BLANKET OR EQUIVALENT 1,550 SYS $5.40 $8,370.00 $3.10 $4,805.00 $4.00 $6,200.00 $6.10 $9,455.00 <br />16 PERMANENT SEEDING 1 AC $2,400.00 $2,400.00 $12,400.00 $12,400.00 $15,000.00 $15,000.00 $13,150.00 $13,150.00 <br />17 1-GALLON STOCK SHRUBS 45 EACH $60.00 $2,700.00 $56.00 $2,520.00 $62.00 $2,790.00 $85.00 $3,825.00 <br />18 TEMPORARY EROSION AND SEDIMENT CONTROL 1 LS $6,000.00 $6,000.00 $3,150.00 $3,150.00 $3,800.00 $3,800.00 $14,000.00 $14,000.00 <br />19 BONDING & INSURANCE 1 LS $30,000.00 $30,000.00 $36,800.00 $36,800.00 $65,850.00 $65,850.00 $3,000.00 $3,000.00Total$505,830.00 $1,030,000.00 $847,490.00 $816,305.00 <br />I hereby certify that the above truly and accurately represents bids received for this project on November 23, 2021 <br />Ross St.Clair, Project Engineer, P.E. <br />Name, Title <br />Milestone Contractors North, Inc. <br />X <br />Engineer's Estimate HRP Construction Co. <br />Non-Collusion Affadavit X <br />Indiana Earth, Inc. <br />X <br />C:\Users\sdoudrick\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\S4WKL6AI\Riverside Dr Bank Stab _Bid Tabulation_11292021