My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPA Consulting Contract - Inspection Contract for Olive Reconstruction, Phase II Proj No. 114-064 – HWC Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
LPA Consulting Contract - Inspection Contract for Olive Reconstruction, Phase II Proj No. 114-064 – HWC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 2:48:18 PM
Creation date
12/21/2021 2:48:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/21/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 of 3 <br />Appendix "D" <br />rate. <br />3.If the LPA does not agree with the amount claimed by the CONSULTANT on a <br />claim voucher, the LPA will send the CONSULTANT a letter by regular mail and <br />list the differences between actual and claimed progress. The letter will be sent to <br />the CONSULTANT's address on page 2 of this Contract or the CONSULTANT's <br />last known address. <br />4.If, prior to the satisfactory completion of the services under this Contract, the total <br />of the direct and indirect costs incurred by the CONSULTANT is within ten percent <br />(10%) of the maximum amount payable, the CONSULTANT shall notify INDOT <br />and the status will be evaluated.
The URL can be used to link to this page
Your browser does not support the video tag.