My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPA Consulting Contract - Inspection Contract for Olive Reconstruction, Phase II Proj No. 114-064 – HWC Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
LPA Consulting Contract - Inspection Contract for Olive Reconstruction, Phase II Proj No. 114-064 – HWC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 2:48:18 PM
Creation date
12/21/2021 2:48:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/21/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Version 6-8-2017 <br />22 <br />APPENDIX “C” <br />SCHEDULE: <br />No work under this Contract shall be performed by the CONSULTANT until the CONSULTANT receives a <br />written notice to proceed from the LPA. <br />All work by the CONSULTANT under this Contract shall be completed and delivered to the LPA for review and <br />approval within the approximate time periods shown in the following submission schedule: <br />The CONSULTANT will be prepared to begin the work under this Agreement within five (5) days after a letter of <br />notification to proceed is received from the LPA. The CONSULTANT shall conform to the below listed items: <br />1.Pre-construction Minutes written and distributed for concurrence, five (5) days after the Pre-Construction <br />meeting is held. <br />2. Final Construction Records to District Construction Director within forty-five (45) days of the contractors last <br />day of work. <br />3.Amended Final Construction Record as necessary to meet the requirements for Tree Plantings, and Notice of <br />Termination to District Construction Director within ten (10) days of Tree Planting acceptance or Notice of <br />Termination filing.
The URL can be used to link to this page
Your browser does not support the video tag.